Over 180 site interventions across industry, hospitality, retail, energy, and public infrastructure — audits, internal emergency plans, and risk analyses built on decades of hands-on field experience.
Risk analysis and emergency planning for mineral extraction and quarrying operations, where ground conditions and heavy machinery raise the stakes.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| MIN-001 | TALPA — Groupe CADEX (Mining) | Morocco | OHS audit & risk analysis of mining operations |
| MIN-002 | TALPA — Groupe CADEX (Mining) | Morocco | Regulatory compliance audit (Moroccan H&S law) |
| MIN-003 | TALPA — Groupe CADEX | Mine site & warehouse | Internal Emergency Plan (POI) |
| MIN-004 | Groupe H — Quarry | Sidi Tiji, Safi | HSSE audit |
Cement, minerals, explosives, electrical equipment, agri-food and beverage plants — production environments where process risk and workplace safety intersect daily.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| MFG-001 | Cimenterie de Témara | Témara (quarry & plant) | Hazard & risk analysis |
| MFG-002 | OMYA (Calcium carbonate manufacturing) | Morocco | Site traffic & circulation plan |
| MFG-003 | INGELEC (Low-voltage electrical equipment) | Casablanca — 5 plants + 4 warehouses | Fire safety diagnostic |
| MFG-004 | CADEX — Explosives production (2 plants) | Morocco | ISO 45001:2018 internal audit |
| MFG-005 | CADEX — Explosives production (2 plants) | Morocco | Regulatory compliance audit |
| MFG-006 | Groupe H — Concrete plant | Had Soualem | HSSE audit |
| MFG-007 | Groupe H — Abattoir | Agadir | HSSE audit |
| MFG-008 | Groupe H — Citrus operation | Agadir (Aït Iaâza) | HSSE audit |
| MFG-009 | Groupe H — Azro site | Aït Melloul, Agadir | HSSE audit |
| MFG-010 | Groupe H — COPAG livestock farm | Agadir | HSSE audit |
| MFG-011 | Groupe H — Faraj site | Agadir | HSSE audit |
| MFG-012 | Groupe H — Tizint site | Tizint | HSSE audit |
| MFG-013 | Groupe H — Site | Ouarzazate | HSSE audit |
| MFG-014 | Coca-Cola bottling plant | Agadir | Internal Emergency Plan (POI) + emergency drills |
Two full manufacturing lines audited for Faurecia Automotive Systems Technologies, both against internal ISO 45001 standards and Moroccan regulatory requirements.
| Ref. | Client / Line | Standard | Scope of Work |
|---|---|---|---|
| AUT-001 | Faurecia — Automotive seats line | ISO 45001:2018 | Internal OHS audit |
| AUT-002 | Faurecia — Automotive seats line | Moroccan law | Regulatory compliance audit |
| AUT-003 | Faurecia — Seat covers (textile & leather) | ISO 45001:2018 | Internal OHS audit |
| AUT-004 | Faurecia — Seat covers (textile & leather) | Moroccan law | Regulatory compliance audit |
Haroon Property Management Services (HPMS), Rabat — engineering, technical studies, and construction project management — audited across both health & safety and environmental management systems.
| Ref. | Client | Standard | Scope of Work |
|---|---|---|---|
| ENG-001 | HPMS, Rabat | ISO 45001:2018 | Internal OHS audit |
| ENG-002 | HPMS, Rabat | Moroccan law | Regulatory compliance audit — H&S |
| ENG-003 | HPMS, Rabat | ISO 14001:2015 | Internal environmental audit |
| ENG-004 | HPMS, Rabat | Moroccan law | Regulatory compliance audit — Environment |
Fuel refining, wind farms, and solar plants audited to ISO 45001 and Moroccan regulation, plus emergency planning for renewable-energy construction sites.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| ENR-001 | SAMIR (Refinery) | Morocco | Audit of furnace fuel-feed circuits + technical/safety upgrade specification |
| ENR-002 | COVEC — 3 photovoltaic plants | Zagora, Missour, Erfoud | Internal Emergency Plan (POI) + emergency drills |
| ENR-003 | EEM — 4 wind farms | Akhfennir, Foum El Oued, Al Houma, Aftissat | ISO 45001:2018 audit |
| ENR-004 | EEM — 4 wind farms | Akhfennir, Foum El Oued, Al Houma, Aftissat | Regulatory compliance audit |
| ENR-005 | NAREVA — Wind farm construction | Aftissat | ISO 45001:2018 audit |
| ENR-006 | NAREVA — Wind farm construction | Aftissat | Regulatory compliance audit |
| ENR-007 | TAREC — Wind farm | Tarfaya | ISO 45001:2018 audit |
| ENR-008 | TAREC — Wind farm | Tarfaya | Regulatory compliance audit |
Head-office and site-level safety work for the insurance and banking sectors, including a fuel-handling risk study at the central bank's Dar Sekkah facility.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| FIN-001 | RMA — Royale Marocaine d'Assurance | Casablanca (3 HQ buildings + basements + archive facility) | OHS audit |
| FIN-002 | RMA — Royale Marocaine d'Assurance | Casablanca (same facilities) | Security audit |
| FIN-003 | Bank Al-Maghreb — Dar Sekkah site | Morocco | Diesel-unloading risk analysis & operating procedure |
| FIN-004 | Bank Al-Maghreb — Dar Sekkah site | Morocco | Internal Emergency Plan (POI), fuel-unloading zones |
Occupational health & safety coverage for large-scale call-centre and customer-relationship operations.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| BPO-001 | Tele-Performance (Call centre operations) | Morocco | ISO 45001:2018 audit |
| BPO-002 | Tele-Performance (Call centre operations) | Morocco | Regulatory compliance audit |
Hazard and risk analyses across the Carrefour and Label Vie retail network, plus an audit of the group's workplace-accident insurance declaration process.
| Ref. | Site | Location | Scope of Work |
|---|---|---|---|
| RTL-001 | Carrefour Market — Yaacoub Mansour | Casablanca | Hazard & risk analysis |
| RTL-002 | Carrefour | Témara | Hazard & risk analysis |
| RTL-003 | Label Vie — Storage platform | Skhirate | Hazard & risk analysis |
| RTL-004 | Carrefour | Skhirate | Hazard & risk analysis |
| RTL-005 | Carrefour | Aïn Sebaâ, Casablanca | Hazard & risk analysis |
| RTL-006 | Carrefour Atacadao | Aïn Sebaâ, Casablanca | Hazard & risk analysis |
| RTL-007 | Carrefour | Bouskoura | Hazard & risk analysis |
| RTL-008 | Label Vie / Carrefour Market Group | National | Audit of workplace-accident insurance declaration management |
Société Marocaine des Tabacs (SMT) — a nationwide audit programme across the company's full logistics footprint: warehouses, distribution centres, cross-docking hubs, and staff leisure facilities, each covering both occupational health & safety and physical security.
| Ref. | Facility Type | Locations | H&S Audit | Security Audit |
|---|---|---|---|---|
| SMT-001 | National PLV Warehouse | Mohammedia | ||
| SMT-002 | Distribution Centres | Ain Atiq, Casablanca, Khouribga, Marrakech, Agadir, Fès, Oujda, Ouarzazate, Laâyoune | ||
| SMT-003 | Cross-docking Centres | Tanger, Tétouan, Safi, Béni Mellal, El Jadida, Midelt, Meknès, Taza, Nador, Guelmim, Dakhla | ||
| SMT-004 | Staff Summer / Leisure Centres | Bouznika, Tamaris, Abdelmoula, Cabo Negro, Marrakech, Ifrane, Imouzzer | ||
| SMT-005 | Sports Complex & MAMA | Casablanca |
34 hotels across seven regions, each audited on-site for HSSE compliance and physical security — from Tangier's coastline to Agadir's resort belt.
| Ref. | Property | City / Region | HSSE Audit | Security Audit |
|---|---|---|---|---|
| HTL-001 | Avanti Hotel | Mohammedia | — | |
| HTL-002 | Vichy Célestins | Bouznika | ||
| HTL-003 | Amphitrite Palace Resort & Spa | Skhirate | ||
| HTL-004 | Sofitel Jardin des Roses | Rabat | ||
| HTL-005 | Ibis Rabat | Rabat | ||
| HTL-006 | The View | Rabat | ||
| HTL-007 | Le Diwan Rabat — MGallery | Rabat | ||
| HTL-008 | Onomo Rabat Medina | Rabat | ||
| HTL-009 | Onomo Rabat Terminus | Rabat | ||
| HTL-010 | Ibis Fès | Fès | ||
| HTL-011 | Barcelo Fès Medina | Fès | ||
| HTL-012 | Sahrai | Fès | ||
| HTL-013 | Volubilis | Fès | ||
| HTL-014 | Marriott | Fès | ||
| HTL-015 | Michlifen Resort & Golf | Ifrane | ||
| HTL-016 | Ibis Meknès | Meknès | ||
| HTL-017 | Zaki Suites Hôtel & Spa | Meknès | ||
| HTL-018 | Menzeh Dalia | Meknès | ||
| HTL-019 | Mercure Rif | Nador | ||
| HTL-020 | Ibis Oujda | Oujda | ||
| HTL-021 | Maamoura | Kénitra | ||
| HTL-022 | Vitality Terminus | Kénitra | ||
| HTL-023 | Sultana | Larache | ||
| HTL-024 | Valeria Lixus Beach Resort | Larache | ||
| HTL-025 | Ibis City Center | Tangier | ||
| HTL-026 | Mövenpick Hotel & Casino Malabata | Tangier | ||
| HTL-027 | Grand Mogador | Tangier | ||
| HTL-028 | Hilton Tangier City Center | Tangier | ||
| HTL-029 | Royal Tulip City Center | Tangier | ||
| HTL-030 | Onomo Tangier Med | Tangier | ||
| HTL-031 | Hilton Houara | Tangier | ||
| HTL-032 | Sofitel Tamuda Bay Beach & Spa | Tangier | ||
| HTL-033 | Villa Laymoun | Ouled Taïma, Agadir | ||
| HTL-034 | Atlantica Park Complex | Agadir |
Beyond audits, our teams supervise safety works directly on construction and infrastructure sites — validating equipment, running performance tests, and attending site meetings through completion.
| Ref. | Project | Location | Scope of Work |
|---|---|---|---|
| SUP-001 | Fire-safety upgrade works, 4 major stadiums | Morocco | Site meetings, equipment validation, performance testing |
| SUP-002 | Fire detection & protection (RIA) installation, 4 courthouse buildings | Tangier & Assilah | Site meetings, equipment validation, performance testing |
| SUP-003 | Vivo Energy — New JET fuel reservoir construction | Bafra, Salé | HSE site supervision |
| SUP-004 | Alstom — TGV line maintenance | Bouznika – Kénitra | HSE site supervision |