Fire safety audits, detection and protection studies, and on-site supervision — from large industrial complexes to national hotel chains, ports, and public buildings.
Fire risk studies and audits across mining, food processing, and specialty manufacturing sites, run against Moroccan fire safety regulation.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| FIR-001 | SACEM — Mining & ore-valorization plant | Morocco | Fire safety study |
| FIR-002 | SACEM — 4 mines & manganese treatment plant | Morocco | Fire safety audit |
| FIR-003 | THALVIN — Production plant | Morocco | Fire safety audit (Moroccan fire regulation) |
| FIR-004 | Éléphant Vert — Biofertilizers, biostimulants & biocontrol plant | Morocco | Fire safety audit + tender specification for upgrade works |
| FIR-005 | MATHE — Moroccan Teas & Infusions (packaging plant) | Bouskoura | Fire safety audit |
| FIR-006 | CIF — Compagnie Industrielle des Fibres (2 plants + warehouses) | Morocco | Fire upgrade study + tender specification |
A long-running programme of fire detection, protection, and special-risk upgrade studies for OCP's Safi and Jorf Lasfar chemical and phosphate installations.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| CHM-001 | OCP — Maroc Chimie complex | Safi | Fire upgrade study (detection, protection, special risks) |
| CHM-002 | OCP — MP1 complex | Safi | Fire upgrade study (detection, protection, special risks) |
| CHM-003 | OCP — MP2 complex | Safi | Fire upgrade study (detection, protection, special risks) |
| CHM-004 | Port of Safi | Safi | Fire upgrade study |
| CHM-005 | OCP — New Sulfuric Acid Plant (SAP) | Jorf Lasfar | Fire detection & protection studies |
| CHM-006 | OCP — New phosphate washery | Lahlassa | Fire detection & protection studies |
| CHM-007 | OCP — New phosphate washery | Merah | Fire detection & protection studies |
| CHM-008 | OCP — Fertilizer complex (ODI) | OCP sites | Detailed fire protection studies |
| CHM-009 | OCP — 100 MVA transformers | OCP sites | Fire upgrade studies |
| CHM-010 | OCP — 60 kV electrical substations, Laâyoune storage | OCP sites | Fire upgrade studies |
| CHM-011 | OCP — "Sulfur Fusion" project | OCP sites | Fire detection & protection studies |
| CHM-012 | OCP — Port installations | Jorf Lasfar | Fire upgrade study |
| CHM-013 | OCP — Petcoke conveyor (Port–plant link) | Jorf Lasfar | Fire protection & detection study |
Fire safety work on national logistics and transport infrastructure, from port terminals to airline ground-service facilities.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| TRP-001 | Tanger Med — Port installations | Tanger | Fire safety audit + upgrade studies + tender specification |
| TRP-002 | Tanger Med — Port installations | Tanger | Fire detection & extinction systems recommissioning study |
| TRP-003 | TGCC — Site base camp, Mohammed VI Tower project | Morocco | Functional testing of fire detectors |
| TRP-004 | Atlas Servair (Royal Air Maroc Group subsidiary) | Morocco | Fire safety system refurbishment study |
From design study through tender launch to on-site supervision — full-lifecycle fire safety work on national sports and judicial buildings.
| Ref. | Project | Location | Scope of Work |
|---|---|---|---|
| PUB-001 | 4 major national stadiums | Morocco | Fire upgrade study + tender specification with financial estimate |
| PUB-002 | 4 major national stadiums | Morocco | Site supervision of fire upgrade works — meetings, equipment validation, performance testing |
| PUB-003 | 4 courthouse buildings | Tanger & Assilah | Fire detection & protection design studies |
| PUB-004 | 4 courthouse buildings | Tanger & Assilah | Site supervision of RIA installation — meetings, equipment validation, performance testing |
Société Marocaine des Tabacs (SMT) — fire safety audits across 40 sites in the company's national logistics footprint: warehouses, distribution centres, cross-docking hubs, and staff leisure facilities.
| Ref. | Facility Type | Locations | Fire Safety Audit |
|---|---|---|---|
| SMF-001 | National PLV Warehouse | Mohammedia | |
| SMF-002 | Distribution Centres | Ain Atiq, Casablanca, Khouribga, Marrakech, Agadir, Fès, Oujda, Ouarzazate, Laâyoune | |
| SMF-003 | Cross-docking Centres | Tanger, Tétouan, Safi, Béni Mellal, El Jadida, Midelt, Meknès, Taza, Nador, Guelmim, Dakhla | |
| SMF-004 | Staff Summer / Leisure Centres | Bouznika, Tamaris, Abdelmoula, Cabo Negro, Marrakech, Ifrane, Imouzzer | |
| SMF-005 | Sports Complex & MAMA | Casablanca |
35 hotels across seven regions audited on-site against Moroccan fire safety regulation, from Tangier's coastline to Agadir's resort belt.
| Ref. | Property | City / Region | Fire Safety Audit |
|---|---|---|---|
| HTF-001 | Eurostar | Morocco | |
| HTF-002 | Vichy Célestins | Bouznika | |
| HTF-003 | Amphitrite Palace Resort & Spa | Skhirate | |
| HTF-004 | Sofitel Jardin des Roses | Rabat | |
| HTF-005 | Ibis Rabat | Rabat | |
| HTF-006 | The View | Rabat | |
| HTF-007 | Le Diwan Rabat — MGallery | Rabat | |
| HTF-008 | Onomo Rabat Medina | Rabat | |
| HTF-009 | Onomo Rabat Terminus | Rabat | |
| HTF-010 | Ibis Fès | Fès | |
| HTF-011 | Barcelo Fès Medina | Fès | |
| HTF-012 | Sahrai | Fès | |
| HTF-013 | Volubilis | Fès | |
| HTF-014 | Marriott | Fès | |
| HTF-015 | Michlifen Resort & Golf | Ifrane | |
| HTF-016 | Ibis Meknès | Meknès | |
| HTF-017 | Zaki Suites Hôtel & Spa | Meknès | |
| HTF-018 | Menzeh Dalia | Meknès | |
| HTF-019 | Mercure Rif | Nador | |
| HTF-020 | Ibis Oujda | Oujda | |
| HTF-021 | Maamoura | Kénitra | |
| HTF-022 | Vitality Terminus | Kénitra | |
| HTF-023 | Sultana | Larache | |
| HTF-024 | Valeria Lixus Beach Resort | Larache | |
| HTF-025 | Ibis City Center | Tangier | |
| HTF-026 | Mövenpick Hotel & Casino Malabata | Tangier | |
| HTF-027 | Grand Mogador | Tangier | |
| HTF-028 | Hilton Tangier City Center | Tangier | |
| HTF-029 | Royal Tulip City Center | Tangier | |
| HTF-030 | Onomo Tangier Med | Tangier | |
| HTF-031 | Hilton Houara | Tangier | |
| HTF-032 | Sofitel Tamuda Bay Beach & Spa | Tangier | |
| HTF-033 | Villa Laymoun | Ouled Taïma, Agadir | |
| HTF-034 | Atlantica Park Complex | Agadir |
Fire safety audits for head-office buildings in the insurance and public-administration sectors.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| COR-001 | RMA — Royale Marocaine d'Assurance | Casablanca (3 HQ buildings + basements + archive facility) | Fire safety audit |
| COR-002 | TGR — Trésorerie Générale du Royaume (Headquarters) | Morocco | Fire safety audit |
This is just one part of our work. Discover our complete portfolio of audits, certifications, and safety interventions across every sector we serve.