HAZOP, HAZID, SIL, and ATEX studies for high-risk process installations — refineries, chemical plants, and phosphate and mineral processing sites.
Process hazard studies on hydrocarbon storage, transport, and refining assets — where a single unrecognised deviation can cascade fast.
| Ref. | Client / Installation | Location | Scope of Work |
|---|---|---|---|
| PSF-001 | SAMIR — Oil refinery (operational units, hydrocarbon storage & transport) | Morocco | HAZOP study |
| PSF-002 | Vivo Energy — Petroleum storage depot | Tan-Tan | HAZOP study |
| PSF-003 | Vivo Energy — Petroleum storage depot | Tan-Tan | HAZOP of Change |
| PSF-004 | Sound Energy — Tendrara gas field transfer to treatment plant | Morocco | HAZOP study |
Process safety coverage of OCP's Jorf Lasfar sulfuric acid and ammonia production chain, including third-party contractor studies.
| Ref. | Client / Installation | Location | Scope of Work |
|---|---|---|---|
| AMM-001 | OCP — New Sulfuric Acid Plant (SAP) | Jorf Lasfar | HAZOP study |
| AMM-002 | OCP — New Sulfuric Acid Plant (SAP) | Jorf Lasfar | ATEX study |
| AMM-003 | OCP — Ammonia line, storage tank to DAP facilities | OCP sites | HAZOP study |
| AMM-004 | OCP — Ammonia production plant | Jorf | HAZOP study |
| AMM-005 | CEMTEC — Phosphate grinding unit, DAP 107 E&F (OCP site) | OCP sites | HAZOP study facilitation |
Full-package risk coverage — fire, process hazard, and explosive-atmosphere studies — for two of OCP's newest phosphate and sulfur project lines.
| Ref. | Client / Installation | Location | Scope of Work |
|---|---|---|---|
| LAY-001 | OCP — New phosphate washery | Laâyoune | Fire detection & protection studies |
| LAY-002 | OCP — New phosphate washery | Laâyoune | HAZOP study |
| LAY-003 | OCP — New phosphate washery | Laâyoune | ATEX study |
| LAY-004 | OCP — "Sulfur Fusion" project | OCP sites | HAZOP study |
| LAY-005 | OCP — "Sulfur Fusion" project | OCP sites | ATEX study |
Hazard and process studies for OCP's fertilizer production complexes at Jorf Lasfar and Safi, plus gas-treatment installations audited on behalf of contracting partners.
| Ref. | Client / Installation | Location | Scope of Work |
|---|---|---|---|
| ODI-001 | OCP — Fertilizer chemical complex (ODI) | Jorf | HAZOP study |
| ODI-002 | OCP — Fertilizer chemical complex (ODI) | Jorf Lasfar | Hazard study (Étude des Dangers) |
| ODI-003 | OCP — New fertilizer chemical complex | Safi | Hazard study (Étude des Dangers) |
| ODI-004 | OCP — Gas treatment installation | Safi | HAZOP study |
| ODI-005 | OCP — Gas treatment installation, on behalf of Servithen | Safi | HAZOP study |
A single strategic pipeline project — moving desalinated seawater from Jorf Lasfar to OCP's phosphate washing plants at Khouribga — covered end to end across hazard identification, operability, and safety-integrity assessment.
| Ref. | Client / Project | Route | Scope of Work |
|---|---|---|---|
| DES-001 | OCP — Desalinated seawater transfer | Jorf Lasfar → Khouribga | HAZID study (Hazard Identification) |
| DES-002 | OCP — Desalinated seawater transfer | Jorf Lasfar → Khouribga | HAZOP study (Hazard & Operability) |
| DES-003 | OCP — Desalinated seawater transfer | Jorf Lasfar → Khouribga | SIL study (Safety Integrity Level) |
Front-end engineering design safety work and process risk studies spanning phosphate processing, FMCG, and automotive cable manufacturing clients.
| Ref. | Client / Project | Location | Scope of Work |
|---|---|---|---|
| MLT-001 | OCP — "Pilot Plant" project | OCP sites | FEED studies: risk analysis, HAZOP, HAZID, fire protection, safety showers, safety distances, ATEX zoning |
| MLT-002 | Unilever — Production installations | Morocco | HAZOP risk studies |
| MLT-003 | COFICAB — Automotive wire & cable manufacturing (3 sites) | Tanger | ATEX study |
This is just one part of our work. Discover our complete portfolio of audits, certifications, and safety interventions across every sector we serve.