Environmental monitoring programmes, impact assessments, and energy audits supporting cleaner, more efficient industrial operations.
A decade-long environmental partnership with OCP, spanning full-lifecycle monitoring programmes and impact assessments across its Jorf Lasfar and Khouribga platforms.
Environmental Monitoring Programmes
| Ref. | Client / Project | Scope of Work |
|---|---|---|
| ENV-001 | OCP — Ammonia storage extension (5 × 25,000T tanks, Jorf) | Environmental monitoring programme: requirements specification, project team training, on-site audit & monitoring for project lifetime |
| ENV-002 | OCP — Seawater pumping & distribution extension (10 future phosphate units) | Environmental monitoring programme (2 lots: pumping station + seawater recovery units) |
| ENV-003 | OCP — High-voltage electrical network extension, Jorf Lasfar (225kV, 60kV substations & links) | Environmental monitoring programme |
| ENV-004 | OCP — Sulfur fusion/filtration unit U263 (12,000 T/day) | Environmental monitoring programme |
| ENV-005 | OCP — Solid sulfur handling & storage (2 × 100,000T halls + conveyors) | Environmental monitoring programme |
| ENV-006 | OCP — Port of Jorf Lasfar rehabilitation & extension | Environmental monitoring programme |
| ENV-007 | OCP — Phosphate ore conveyance, Khouribga → Jorf Lasfar (slurry pipeline) | Environmental monitoring programme |
| ENV-008 | OCP — Phosphate ore distribution, Khouribga → Jorf Lasfar (slurry pipeline) | Environmental monitoring programme |
| ENV-009 | OCP — Steam production & distribution (sulfur fusion, sulfur/fuel tracing) | Environmental monitoring programme |
| ENV-010 | OCP — "Maroc Central" project (45 Mm³/yr water transfer, Aït Massoud dam → Khouribga) | Environmental monitoring programme |
Environmental Impact Assessments & Technical Studies
| Ref. | Client / Project | Scope of Work |
|---|---|---|
| EIA-001 | OCP — Ammonia storage extension, Jorf | Environmental Impact Assessment |
| EIA-002 | OCP — Seawater pumping & distribution extension | Environmental Impact Assessment |
| EIA-003 | OCP — High-voltage electrical network extension, Jorf Lasfar | Environmental Impact Assessment |
| EIA-004 | OCP — Sulfur fusion/filtration unit U263 | Environmental Impact Assessment |
| EIA-005 | OCP — Solid sulfur handling & storage | Environmental Impact Assessment |
| EIA-006 | OCP — Port of Jorf Lasfar rehabilitation & extension | Environmental evaluation |
| EIA-007 | OCP — Phosphate ore conveyance (slurry pipeline) | Environmental evaluation |
| EIA-008 | OCP — Phosphate ore distribution (slurry pipeline) | Environmental evaluation |
| EIA-009 | OCP — Steam production & distribution project | Environmental Impact Assessment |
| EIA-010 | OCP — "Maroc Central" water transfer project | Environmental Impact Assessment (participation) |
| EIA-011 | OCP Group — Youssoufia Aeroclub project | Environmental Impact Assessment |
Environmental and energy auditing across Morocco's cement industry — plants, quarries, and grinding centres — plus international work in Tunisia.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| CEM-001 | INDUSAHA — Cement grinding centre | Laâyoune | Internal environmental audit, ISO 14001:2015 |
| CEM-002 | Asment Témara | Plant & quarry | Environmental audit, ISO 14001:2015 |
| CEM-003 | Ciments du Maroc — Grinding centre | Jorf | Internal environmental audit, ISO 14001:2015 (FY2024) |
| CEM-004 | Ciments du Maroc — Grinding centre | Jorf | Internal environmental audit, ISO 14001:2015 (FY2022) |
| CEM-005 | Ciments du Maroc — Plant & quarry | Aït Baha, Agadir | Internal environmental audit, ISO 14001:2015 (FY2021) |
| CEM-006 | Ciments du Maroc — Plant & quarry | Aït Baha, Agadir | Internal environmental audit, ISO 14001:2015 (FY2022) |
| CEM-007 | Ciments du Maroc — Plant & quarry | Marrakech | Internal environmental audit, ISO 14001:2015 (FY2022) |
| CEM-008 | Ciments du Maroc — Plant & quarry | Safi | Internal environmental audit, ISO 14001:2015 (FY2021) |
| CEM-009 | Ciments du Maroc — Plant & quarry | Safi | Internal environmental audit, ISO 14001:2015 (FY2022) |
| CEM-010 | TTSUD — Cement grinding & shipping centre | Tanger | Environmental Impact Assessment |
| CEM-011 | Cimenterie de Témara — Grinding capacity extension | Témara | Technical assistance for Environmental Impact Assessment |
| CEM-012 | Cimenterie de Témara | Témara | Energy audit — furnace & preheater (fuel consumption) |
| CEM-013 | Cimenterie de Témara | Témara | Energy audit — cooler (electricity consumption) |
| CEM-014 | Cimenterie de Témara | Témara | Energy audit — grinders (electricity consumption) |
| CEM-015 | Cimenterie de Jbel Oust | Tunisia | Energy audit — furnace & preheater (fuel consumption) |
| CEM-016 | Cimenterie de Jbel Oust | Tunisia | Energy audit — furnace & preheater (electricity consumption) |
| CEM-017 | Cimenterie de Jbel Oust | Tunisia | Energy audit — grinders (electricity consumption) |
| CEM-018 | Asment Témara | Témara | Internal audit, ISO 50001:2018 (energy management) |
Environmental system audits across Faurecia's seats, seat-cover, and components manufacturing lines.
| Ref. | Client / Line | Standard | Scope of Work |
|---|---|---|---|
| AUT-001 | Faurecia — Automotive seats | — | Internal environmental audit |
| AUT-002 | Faurecia Automotive Industry — Seats | ISO 45001:2018 | Internal environmental audit |
| AUT-003 | Faurecia Automotive Industry — Seats | ISO 14001:2015 | Internal environmental audit |
| AUT-004 | Faurecia Automotive Industry — Seat covers (textile & leather) | ISO 14001:2015 | Internal environmental audit |
| AUT-005 | Faurecia Automotive Industry — Seat covers (textile & leather) | ISO 45001:2018 | Internal environmental audit |
| AUT-006 | Faurecia Automotive Industry — Automotive components manufacturing | ISO 14001:2015 | Internal environmental audit |
Environmental management system audit across TALPA's full mining footprint.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| MIN-001 | TALPA — Groupe CADEX | 3 mine sites (Tazalakhet, Tiferki, Bleïda) + HQ + maintenance workshops | Internal environmental audit |
Environmental audits for explosives production and ready-mix concrete plants.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| MFG-001 | CADEX — Explosives production (2 plants) | Morocco | Internal environmental audit, ISO 14001:2015 |
| MFG-002 | Bétomar — Concrete plant | Aïn Sebaâ | Internal environmental audit, ISO 14001:2015 |
| MFG-003 | Bétomar — Concrete plant | Tit Mellil | Internal environmental audit, ISO 14001:2015 |
| MFG-004 | Bétomar — Concrete plant | Berrechid | Internal environmental audit, ISO 14001:2015 |
Waste management compliance and energy management system audits for insurance and banking clients.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| FIN-001 | AXA Assistance (5 buildings) | Morocco | Internal audit — compliance with waste management procedure |
| FIN-002 | AXA Services (5 administrative buildings) | Morocco | Waste generation study + design of waste management procedure & recovery channels |
| FIN-003 | Bank of Africa | Morocco | Internal audit, ISO 50001:2018 (energy management) |
Certification-level environmental management system audit for Morocco's leading brewing group.
| Ref. | Client | Location | Scope of Work |
|---|---|---|---|
| FNB-001 | SBM — Société des Brasseries du Maroc | Morocco | Environmental Management System certification audit |
Environmental audits and impact studies for Morocco's growing data centre footprint.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| TEC-001 | N+ONE — 2 data centres | Casablanca & Berrechid | Internal environmental audit, ISO 14001:2015 |
| TEC-002 | SAPINO Industrial Park — 15 MW data centre project | Morocco | Environmental evaluation |
Energy efficiency studies across the Mohammedia refinery's furnaces, steam network, and heat-exchange systems.
| Ref. | Client / Site | Location | Scope of Work |
|---|---|---|---|
| OIL-001 | Oil refinery — Furnace | Mohammedia | Energy study — fuel preheating substitution via distillation by-product, heat-exchange train optimization |
| OIL-002 | Oil refinery — Steam circuit | Mohammedia | Energy audit — leak detection & hot-spot identification |
| OIL-003 | Oil refinery — Furnaces (multiple) | Mohammedia | Energy audits — consumption optimization |
| OIL-004 | Oil refinery — Distillation column heat-exchange train | Mohammedia | Energy study — exchange surface & consumption optimization |
Methodological and policy-level work that spans beyond any single client — sector studies and international-standard frameworks.
| Ref. | Project | Scope of Work |
|---|---|---|
| XSC-001 | National waste management sector study | Participation in sectoral study on waste management in Morocco |
| XSC-002 | OCP — Subcontractor environmental requirements | Drafting of environmental requirements annex for industrial project tenders |
| XSC-003 | OCP — Development projects | Technical notes in line with MIGA and World Bank standards |
This is just one part of our work. Discover our complete portfolio of audits, certifications, and safety interventions across every sector we serve.