API RP 752 Explained is a practical way to approach a subject many HSE and operations leaders grapple with: how to site permanent buildings at process facilities so that people are protected from fires, explosions, and toxic releases. In refineries, gas plants, petrochemical complexes, logistics terminals, and power stations in the UAE, the location and design of control rooms, offices, labs, workshops, and other occupied structures can make the difference between a near-miss and a mass-casualty event. Understanding what this recommended practice covers—and how to implement it intelligently alongside local regulations and corporate risk criteria—is essential to responsible, resilient operations.
At its core, API Recommended Practice 752 addresses “Management of Hazards Associated with Location of Process Plant Buildings.” It complements related guidance on portable buildings and tents, and it sits alongside process safety frameworks and regulatory obligations relevant to the UAE, such as OSHAD requirements, Dubai Municipality approvals, Civil Defence fire safety codes, MOHRE occupational safety expectations, and ADNOC’s HSE directives where applicable. When applied well, it becomes a bridge between detailed hazard and risk studies (HAZOP, HAZID, LOPA, Bowtie, QRA) and everyday operational decisions about where people work and how buildings perform under credible accident loads.
Who This Concerns in the UAE Industrial Context

Because siting affects where people spend long stretches of time, the topic cuts across technical, operational, and corporate functions. The following groups typically play a role in applying siting guidance and sustaining it over time:
- HSE and Process Safety managers accountable for risk criteria, corporate standards, and compliance mapping (ISO 45001, ISO 14001, and internal process safety elements).
- Engineering, Projects, and Facilities teams responsible for FEED, detailed design, brownfield modifications, and building performance specifications (including blast, fire, and toxic protection features).
- Operations, Maintenance, and Turnaround leaders who manage day-to-day occupancy patterns, contractor presence, and temporary works near process areas.
- Emergency Response and Security teams who plan muster points, shelter-in-place strategies, and egress routes in coordination with Civil Defence expectations and NFPA code alignments.
- Asset, Real Estate, and Capital Planning stakeholders who must balance footprint constraints, future expansions, and business continuity needs.
- IT/OT and Control Systems teams when siting and hardening central and satellite control rooms, data hubs, and backup facilities to align with IEC 61511 safety instrumented systems and cybersecurity segmentation.
Facility types that most commonly rely on this guidance include onshore oil and gas processing facilities, refineries with FCC and hydroprocessing units, NGL/LPG fractionation, petrochemical complexes (ethylene crackers, polymer units), storage terminals and tank farms, LNG import facilities, and power generation plants co-located with fuel storage and transfer systems. In each case, the mix of congested process areas, pressurized equipment, and flammable/toxic inventories creates credible accident loads that must be translated into siting and building performance requirements.
Why Siting Guidance Matters

After establishing who is involved, the next question is why siting is so consequential. The short answer is that people tend to cluster in buildings—control rooms, labs, offices, and workshops—located close to hazardous process units. In the event of a vapor cloud explosion, jet fire, pool fire, or toxic gas release (such as H2S or chlorine), these buildings can experience structural loads and hazardous concentrations that close the window for evacuation, overwhelm shelter-in-place measures, or cause secondary damage (shattered glazing, falling debris, loss of HVAC pressurization).
Historically, several major accidents around the world have shown that building location and performance strongly influence casualty numbers and emergency effectiveness. Even when a facility’s process safety systems (SIS, ESD, relief and flare systems) perform as designed, overpressure and thermal radiation can travel significant distances through congested equipment, cable racks, and pipeways. Additionally, siting has business continuity implications: the loss of a central control room or key maintenance building can turn a localized incident into a site-wide outage.
From a compliance standpoint in the UAE, siting decisions intersect with multiple oversight angles. ADNOC operating companies rely on internal HSE frameworks and Codes of Practice; OSHAD enforces a structured approach to occupational risk; Dubai Municipality and the Civil Defence authorities apply permitting and fire safety perspectives; and MOHRE oversees workforce welfare and safety. Aligning siting with these expectations—while adhering to recognized industry guidance such as API RPs, NFPA codes, and ISO standards—creates a defensible, auditable position that also protects people and assets.
Key Points to Understand

Building on the “why,” it helps to unpack the core components of permanent building siting guidance and how practitioners interpret them for day-to-day decisions:
- Scope and building types: The focus is on permanent buildings—control rooms, administrative offices, labs, workshops, and warehouses that are fixed, occupied repeatedly, and critical to operations. Portable buildings and trailers follow separate guidance; tents and temporary shelters also require distinct consideration.
- Hazard types: The dominant threats are toxic gas dispersion (e.g., H2S, chlorine, ammonia), fires (jet and pool), and vapor cloud explosions (VCE) or BLEVEs in storage and transfer areas. For each, siting considers exposure thresholds such as lethal concentration times, thermal flux levels, and overpressure ranges.
- Occupancy and vulnerability: It is not only where the building sits, but how many people are inside, for how long, and what they do (e.g., control room operators who must remain in place versus office staff who can evacuate). Vulnerability is also a function of building construction (masonry, reinforced concrete, steel frame), glazing, doors, and HVAC design (pressurization, gas detection, shutdown logic).
- Hazard screening and detailed evaluation: Practitioners commonly start with screening distances and qualitative assessments before proceeding to quantitative risk assessment (QRA), dispersion and explosion modeling, and structural response checks. Screening can identify low-risk buildings quickly, allowing resources to focus on challenging cases near high-energy units.
- Performance targets and criteria: Acceptability criteria typically include occupant risk tolerability thresholds, building performance limits (e.g., no structural collapse, controlled damage), and egress/shelter-in-place objectives. These criteria should be consistent with corporate risk policy, local regulators’ preferences, and accepted industry practice.
- Decision outcomes: Results translate into clear actions—relocate the building; harden/retrofit for blast, fire, and toxic ingress; change occupancy (reduce headcount or time at risk); modify layouts and congested volumes; or add protection layers (e.g., improved detection, isolation, deluge, or SIS trips configured in line with IEC 61511 and LOPA insights).
To ground these points, the following table summarizes common hazard categories, the metrics typically assessed, and examples of analysis tools and protective outcomes that practitioners consider when applying siting guidance.
| Hazard Category | Typical Exposure Metrics | Common Analysis Approaches | Example Protective Decisions |
|---|---|---|---|
| Toxic gas release (e.g., H2S, Cl2, NH3) | Concentration vs. time (ppm-min), lethality thresholds, HVAC infiltration rates | Source term estimation, dispersion modeling, QRA frequency-calibrated contours | Relocate building outside toxic contours; positive-pressure HVAC and CABA availability; enhanced gas detection and automatic damper closure |
| Jet/pool fire | Thermal radiation (kW/m²) and duration, secondary fires, structural heat-up | Jet/pool fire radiation models, equipment layout heat mapping, deluge interaction | Increase separation; fireproofing and façade upgrades; protected egress routes; passive fire barriers and radiant heat shields |
| Vapor cloud explosion (VCE) | Overpressure (bar), impulse, fragment/debris loads, glazing response | Congestion assessment, explosion modeling, structural response checks | Blast-resistant design/retrofit; reduce nearby congestion; relocate critical functions; fragment-resistant glazing and door anchorage |
| BLEVE in storage/transfer | Thermal and overpressure envelopes, projectiles | Event tree analysis, tank inventory and relief evaluation, layout consequence mapping | Adjust tank spacing and building offsets; upgrade emergency depressurization; dedicated barriers for projectile-limited zones |
Each of these analyses is stronger when anchored to documented governance and accountable ownership. For readers who track corporate governance artifacts and NPM’s broader context, a helpful pointer is the public-facing resource at CABINET NPM, which provides organizational background separate from technical guidance such as siting rationales and risk criteria.
Practitioners also integrate siting outcomes with related frameworks. For example, if a QRA establishes individual and societal risk contours around a process unit, the siting of permanent buildings aligns with those contours and the facility’s risk tolerability framework. Bowtie analyses clarify preventive and mitigative barriers that reduce event likelihood and severity, while LOPA confirms whether instrumented functions are needed to achieve target risk reductions. NFPA codes help shape internal fire compartmentation and egress capacity, and ISO 45001 management system elements ensure that building registers, occupancy controls, and MOC-driven updates remain current and auditable.
How This Works in Practice

Turning principles into action requires discipline over the full asset lifecycle. New projects typically address siting during concept and FEED stages so that master layouts position occupied buildings outside intolerable hazard zones. In brownfield settings—common across mature UAE assets—revalidation is essential whenever inventories change, units are revamped, or headcounts shift. Linking siting to Management of Change avoids the classic drift where a low-occupancy workshop becomes a de facto office hub over time.
On the ground, teams often find that “people convenience” conflicts with “risk distance.” A maintenance shop steps closer to a unit because that’s where the work is; a lab is built in the process area because sampling is frequent; an admin building grows near the gate because of traffic routes. Siting governance makes these trade-offs explicit, allowing a facility to judge whether additional distance, building hardening, occupancy limits, or barrier enhancements can keep risk within policy.
Control rooms deserve special attention. Beyond blast resistance, they require integrity of power, communications, and HVAC (for toxic exclusion) to remain mission-capable during an event. Dual or satellite control rooms, remote I/O cabinets, and safe shutdown philosophies (consistent with IEC 61511) can be decisive in preventing a localized incident from escalating. Similarly, muster points, safe havens, and shelter-in-place rooms must account for toxic ingress, external thermal loads, and credible projectile or debris paths.
Contractor accommodation and temporary village-like setups are another recurring challenge during turnarounds. While API RP guidance for portable buildings differs, permanent “semi-temporary” structures sometimes remain longer than planned. Clear governance that differentiates permanent from portable occupancy, and that assigns risk stewardship to named owners, is essential to prevent slow drift into unsafe patterns.
Finally, sustaining siting decisions requires robust information management. A living building register should track each structure’s category (occupied, intermittently occupied, unoccupied), design basis (blast, fire, toxic), envelope limitations, and the last time its siting rationale was reviewed. Incident learnings, near-miss trends, and results from exercises or drills can then feed back into the siting logic, ensuring the practice evolves with the facility.
Benefits and Practical Use Cases

Once organizations tie siting into their risk management fabric, the downstream advantages are tangible. In most cases, benefits emerge along four dimensions—safety, compliance, operability, and cost control—because well-sited and right-sized buildings reduce both incident impact and lifecycle expenses.
- Safety and wellbeing: Reduced personnel exposure to overpressure, thermal radiation, and toxic gas; minimized mass-casualty potential; clearer evacuation and shelter-in-place performance.
- Compliance assurance: A defensible record that aligns with applicable UAE regulatory expectations (OSHAD, Dubai Municipality, Civil Defence, MOHRE) and recognized standards (API RPs, NFPA, ISO 45001).
- Operational resilience: Ability to maintain control and communications during upset conditions; better continuity of critical functions (control room operations, emergency command posts).
- Smarter capital and OPEX: Avoids over-hardening every structure while targeting investments at buildings with real exposure; reduces unplanned downtime from vulnerable or damaged facilities.
Concrete examples help illustrate how this plays out:
- Refinery case: Replacing glazing and strengthening door anchorage at a maintenance building near an FCC unit, paired with reducing peak headcount during high-risk operating modes, to manage blast exposure without full relocation.
- Petrochemical complex: Relocating a central lab away from a congested pipe rack corridor after VCE modeling identified an impulse exceedance; installing a satellite sampling kiosk near process units to preserve productivity.
- LNG import terminal: Converting an administrative building to a positive-pressure shelter-in-place zone for specific wind conditions in potential toxic envelopes; adding remote shutdown and gas detection logic tied to HVAC isolation.
- Power generation adjacent to fuel storage: Reorienting a warehouse to shield against radiant heat from a credible pool fire; fireproofing support columns and providing a protected egress corridor toward an upwind muster area.
- Storage terminal: Reassigning a set of offices to “intermittently occupied,” placing signposted time limits and digital access control to ensure exposure remains within acceptable bounds verified by QRA contours.
These outcomes reflect the central insight of siting practice: decisions are rarely binary. Partial hardening, occupancy management, improved barriers, and modest relocations often combine to produce a balanced, standards-aligned solution suited to footprint and budget realities.
Best Practices and Points of Caution

From the successes and near-misses that teams report, several best practices consistently stand out. Equally, there are common pitfalls that can undermine even well-intended siting programs.
- Make risk criteria explicit: Document tolerability criteria for occupants and building performance. Link them to corporate policy and ensure cross-functional buy-in (HSE, Engineering, Operations, Projects).
- Integrate with QRA and Bowtie logic: Use facility QRAs to anchor exposure contours and frequency-weighted outcomes. Reflect preventive and mitigative barriers in the siting basis and in building protection features.
- Prioritize control rooms and emergency hubs: Treat these as critical infrastructure. Validate blast design, redundant power and comms, HVAC toxic exclusion, and operator survivability assumptions.
- Keep a living building register: Record occupancy category, design basis, and last review. Flag drift (e.g., headcount growth) and trigger MOC when thresholds are exceeded.
- Align with local authorities early: Dubai Municipality permitting, Civil Defence fire safety approvals, and ADNOC/OSHAD frameworks all have a bearing on siting, fireproofing, and occupancy controls. Early dialogue avoids redesign later.
- Beware modeling blind spots: Explosion predictions are sensitive to congestion and confinement assumptions; toxic infiltration depends on real HVAC performance. Use conservative envelopes and verify critical inputs with site data.
- Design for the human factor: Consider how people actually use spaces—shift changes, toolbox talks, visitor flow. Control access and time-at-risk near process units with clear signage and digital systems where practical.
- Exercise and drill: Validate muster routes, shelter-in-place durations, and communications under realistic conditions, learning from each drill and updating the siting rationale accordingly.
A final caution is cultural: siting is not just a one-off study. Without governance, today’s compliant layout can slip out of bounds through incremental changes—new storage, an added meeting room, a shortcut walkway—over months and years. Treat siting as part of the management system fabric rather than a shelf document.
Frequently Asked Questions About API RP 752

What is the core purpose of the recommended practice on permanent building siting?

Its purpose is to help organizations manage hazards to occupants of permanent buildings located near process units. It guides practitioners in identifying relevant fire, explosion, and toxic threats, evaluating building exposure and vulnerability, and deciding whether to relocate, harden, or manage occupancy so that risk remains within corporate and regulatory tolerability thresholds.
How does this guidance differ from portable building recommendations?
Permanent buildings (control rooms, offices, labs, workshops) are within the main siting guidance, while separate recommendations typically address portable buildings and tents due to their different construction and occupancy patterns. In practice, facilities need governance that distinguishes permanent, semi-permanent, and portable structures, with risk stewardship assigned accordingly.
Which hazard types are usually most critical near process units?
Vapor cloud explosions (VCE) in congested process areas, jet and pool fires from pressurized or gravity-fed releases, and toxic gas dispersion (e.g., H2S, chlorine, ammonia) are the dominant concerns. BLEVE scenarios at pressurized storage and transfer points can also matter, depending on inventories and layout.
Does siting analysis always require full QRA and advanced modeling?
No. Many programs begin with screening methods that use conservative standoff distances and qualitative checks to identify low-exposure buildings. Detailed modeling—dispersion, explosion, structural response—is typically reserved for buildings near high-energy units or where screening results are inconclusive. That said, QRAs provide valuable frequency-weighted context for deciding how robust a solution needs to be.
How are control rooms treated differently from standard offices?
Control rooms often must remain staffed during emergencies, so their performance objectives are more stringent: blast-resistant envelopes, positive-pressure HVAC with gas-tight features, redundant power and communications, and clear ergonomic layouts that support operators. They may be duplicated or backed up by remote or satellite rooms to improve resilience.
What role do local UAE regulations and authorities play?
While siting guidance offers industry best practice, UAE facilities must also align with OSHAD requirements, Dubai Municipality permitting, Civil Defence fire safety codes, MOHRE workforce safety expectations, and any ADNOC HSE directives that apply. Engaging with authorities early helps align interpretations around fireproofing, egress, occupancy limits, and emergency planning.
How frequently should siting decisions be revisited?
At a minimum, re-evaluate siting when major changes occur—new or revamped units, altered inventories, headcount shifts, or significant layout modifications. Many organizations set a periodic review cadence tied to their management system, with MOC triggers for specific thresholds (e.g., occupancy changes beyond a set number or percentage).
What documentation should be maintained for audit and assurance?
A building register that captures occupancy categories, design basis and performance targets (blast, fire, toxic), siting rationale, last review date, and assigned risk owner is foundational. Supporting analyses (HAZID, QRA, explosion/dispersion models, structural checks) and records of drills or exercises should be accessible for internal and external assurance.
Conclusion
When teams have a shared understanding of siting principles, the decisions that follow are both safer and more practical. The earlier sections explained who is impacted across HSE, Engineering, Operations, Projects, and Emergency Response; why siting matters for people protection, compliance, and continuity; the key elements practitioners assess (hazard types, occupancy, performance targets, modeling); and how these translate into real-world outcomes such as relocation, hardening, occupancy management, and barrier improvements. In the UAE, aligning this approach with OSHAD, Dubai Municipality, Civil Defence, MOHRE, and ADNOC HSE expectations creates a coherent, defendable pathway that protects people and sustains operations. Whether a facility is greenfield or decades into brownfield evolution, treating siting as a living management practice rather than a one-off study will keep decisions relevant as configurations, inventories, and work patterns change.
To go further on this topic, NPM’s broader Facility Siting Study Services UAE page covers this in more depth.
Our References
NPM’s portfolio reflects a wide spectrum of high-hazard industries and operating contexts where siting, consequence analysis, and risk governance were central to safeguarding people and assets. Our teams have supported operators of refineries with complex FCC and hydrocracking units, integrated petrochemical sites with high-congestion corridors, gas processing and NGL fractionation plants, LNG import terminals, and large storage terminals with mixed LPG, gasoline, and diesel inventories. Beyond hydrocarbons, our experience includes power generation assets co-located with fuel handling systems, as well as logistics and manufacturing facilities facing toxic and flammable material risks. In every case, our work integrates recognized standards and methods—HAZOP to identify deviations, Bowtie to organize barriers, LOPA to quantify needed risk reductions, and QRA to frame frequency-weighted outcomes—so that building siting decisions rest on a defensible, documented basis.
Across varied geographies and regulatory regimes, NPM has helped clients reconcile practical footprint constraints with the need for safe separation, blast-resistant design, and toxic ingress control. The references include building register creation and revalidation, control room hardening strategies aligned with operator survivability needs, staged relocation programs that maintain business continuity, and governance models that prevent “risk creep” over time. Many engagements required coordinated interface with authorities having jurisdiction to ensure that NFPA-aligned fire safety design, egress capacity, and emergency planning were properly reflected in the siting logic. Others focused on lifecycle sustainment—embedding siting criteria into project stage gates and Management of Change so decisions stay current as facilities evolve. Readers exploring our references will find patterns that mirror the themes discussed in this article: clear criteria, realistic modeling, practical decisions, and disciplined follow-through. These examples illustrate how siting, when treated as a living practice, strengthens both personal safety and operational resilience over the long term.
For more information about our references, visit Our References.
Speak with NPM
If you would like to discuss how permanent building siting principles apply to your facility, our team is available to share perspectives and considerations tailored to your context. We welcome technical questions about methods, criteria, and integration with local regulatory expectations. For any further questions or to speak with our team, Contact Us.