Design Hazard Review for New Processing Facility is a topic that sits at the intersection of engineering, operations, and governance — and it often determines whether a plant starts up smoothly, complies with UAE requirements, and sustains safe performance over decades. In the earliest sketches of a process flow diagram and the latest refinements before pre-startup, structured hazard thinking shapes thousands of decisions: plot plan and spacing, emergency shutdown (ESD) segmentation, firewater coverage, hazardous area classification, safety instrumented systems (SIS) performance, human-machine interface, and the lines of defense that keep major accident hazards under control. This article unpacks the concepts, timing, techniques, and practical reality of doing this well in the UAE industrial context, referencing relevant standards such as IEC 61511, API RP 14C/750, ISO 45001, ISO 14001, NFPA codes, and local authority approvals including OSHAD, Dubai Municipality, Civil Defence, MOHRE, and ADNOC HSE requirements.
Who This Concerns in a New Facility Build

While safety is a shared responsibility, design hazard reviews touch specific roles, teams, and decision points through the project lifecycle. Understanding where you fit helps you anticipate what information you’ll need and which decisions your team will influence.
- Project directors and engineering managers who must gatekeep design maturity and risk reduction at concept select, FEED, detailed design, and commissioning.
- HSE managers, process safety engineers, and risk specialists responsible for hazard identification (HAZID), hazard and operability analysis (HAZOP), layers of protection analysis (LOPA), bowtie analysis, and quantitative risk assessment (QRA).
- Process, mechanical, electrical, instrumentation and controls (I&C), and civil/structural engineers who own PFDs, P&IDs, cause-and-effect matrices, hazardous area classification, SIS logic, and equipment specifications.
- Operations and maintenance representatives whose tacit knowledge anchors realistic human factors, operability, isolation, and maintainability assumptions during the reviews.
- EPC contractors and vendors delivering packages (e.g., compressors, fired heaters, boilers, flare systems, storage tanks, truck loading, metering skids) that must be integrated into the overall risk picture.
- Regulatory/compliance coordinators who align with OSHAD, Dubai Municipality, Civil Defence (UAE Fire and Life Safety Code), MOHRE, and ADNOC codes of practice and interface with insurers when required.
Facility types vary widely, but the core audience is constant: decision-makers and technical contributors in Oil & Gas and Petrochemicals (refineries, gas plants, offshore platforms, pipelines, terminals), Power Generation (CCGT, simple cycle, diesel), Chemicals and Manufacturing (polymer plants, blending units, cement, metals), Logistics (fuel depots, LPG, cryogenic terminals), and Construction-related process assets (district cooling, batching and mixing). Each faces a different hazard landscape, yet the review discipline unites them.
Why Getting the Design Safety Review Right Matters

Design decisions harden quickly. Once the battery limits, equipment sizes, and control narratives are set, it becomes progressively harder and more expensive to change them. Early hazard thinking therefore prevents late-stage rework, reduces capital cost risk, and avoids schedule slips associated with re-routing pipe racks, resizing containment, or reclassifying hazardous areas after procurement. More importantly, credible prevention and mitigation layers — aligned to ALARP principles — reduce the likelihood and consequence of major accident events such as loss of containment, fires, explosions, toxic releases, overpressure, and environmental harm.
In the UAE, the stakes include statutory compliance and external approvals. OSHAD’s framework in Abu Dhabi expects structured risk management and documented controls. Dubai Municipality plan approvals and Civil Defence no-objection certificates (NOCs) hinge on demonstrable compliance with the UAE Fire and Life Safety Code and supporting NFPA/API details. ADNOC’s HSE requirements specify risk processes, competency expectations, and MAH (major accident hazard) management, particularly for brownfield tie-ins or SIMOPS (simultaneous operations). Insurance underwriters increasingly request QRA outputs, ignition control evidence, or SIS performance calculations. A well-structured review program is the backbone that ties these obligations together into a coherent risk justification.
From an operational perspective, design reviews hardwire practicalities: can operators reach isolation valves within credible response times? Are blind spots addressed in control room HMI layouts? Will automatic depressurization create unacceptable thermal shock? Are ESD segments sized to confine hazardous inventories? These are not academic questions; they define how a real shift team keeps a plant safe on a windy night during a power dip or a pump seal failure.
Key Points to Understand

What a Design Hazard Review Really Is

A design-phase hazard review is not a single meeting. It is a structured, staged set of studies that deepen in resolution as the design matures. Instead of treating HAZOP as the entire story, view it as one pillar in a program that begins at concept (HAZID) and culminates before start-up (PSSR). Between those endpoints, risk-based methods support design choices, specify functional safety targets, and prove that layers of protection are independent and capable.
- Concept/feasibility: HAZID, inherently safer design (ISD), plot plan and spacing philosophy, preliminary hazardous area classification.
- FEED: Preliminary HAZOP or design review workshops, fire and gas mapping studies, QRA scoping, explosion/dispersion modeling as needed, bowtie development, ESD segmentation strategy.
- Detailed design: Full HAZOP, LOPA, SIL determination (IEC 61511), SIS safety requirements specifications (SRS), detailed hazardous area classification, fire protection/detection design, drainage and containment engineering.
- Late design/commissioning: Vehicle access for emergency response, cause-and-effect verification, alarm rationalization, operability and maintainability walkdowns, pre-startup safety review (PSSR).
Standards and Codes That Anchor Good Practice

Hazard review credibility depends on recognized standards. For functional safety in the process sector, IEC 61511 is the core reference for lifecycle, SIL assignment, SIF design, proof testing, and management of change. API RP 14C provides a time-tested basis for offshore production safety systems, while API RP 750 frames process hazard management expectations in refining and petrochemicals. ISO 45001 and ISO 14001 integrate occupational and environmental management systems into design thinking, and NFPA codes inform fire protection details (foam systems, hydrants, water supplies, hazardous materials storage). Locally, OSHAD, Dubai Municipality, Civil Defence, MOHRE, and ADNOC HSE requirements guide approvals and proof of adequacy. For document governance and technical clarity, resources such as CABINET NPM can be helpful reference points for structuring policies, procedures, and evidentiary records that stand up to regulatory and insurer scrutiny.
Techniques, Their Roles, and How They Connect

Each technique serves a different purpose, and they work best as a connected set rather than isolated checks:
- HAZID maps credible hazards early, when moving equipment, reorienting a flare, or resizing bunds is still cheap.
- HAZOP interrogates P&IDs at node level to identify deviations (e.g., high pressure, reverse flow) and determine causes, consequences, safeguards, and recommendations.
- LOPA quantifies whether the combination of initiating event frequency and independent protection layers (IPLs) gives a tolerable risk; if not, additional layers or an SIS function is warranted.
- SIL determination converts LOPA outcomes to target risk reductions. IEC 61511 then governs SRS, architecture, proof test intervals, and management.
- QRA, where warranted, quantifies individual and societal risk to workers and the public, shapes layout, and supports Civil Defence or ADNOC submissions.
- Bowtie diagrams visualize barrier integrity by linking threats, top events, and consequences with prevention and mitigation layers — a compelling way to communicate with leadership and regulators.
Design Stage Versus Hazard Focus

The timing of each review shapes what “good” looks like. The table below aligns typical UAE project stages with the primary hazard focus, techniques, and key outputs that support informed gate decisions.
| Project Stage | Primary Hazard Focus | Typical Techniques Applied | Key Decision Outputs |
|---|---|---|---|
| Concept Select | Major hazards, layout/spacing, inventory limits, offsite impacts | HAZID, ISD review, preliminary hazardous area classification | Plot plan philosophy, equipment separation, flare sizing direction, bunding strategy, preliminary risk register |
| FEED | Control of ignition, ESD segmentation, firewater coverage | Design reviews, preliminary HAZOP, fire and gas mapping, QRA scoping | ESD segmentation map, firewater demand/coverage, gas detector placement strategy, QRA need statement |
| Detailed Design | Node-level hazards, IPL independence, SIS performance | Full HAZOP, LOPA, SIL determination, hazardous area classification, NFPA-based fire system design | Actioned HAZOP register, SIL targets and SRS, cause-and-effect matrix, equipment classification drawings |
| Construction/Commissioning | Human factors, access/egress, validation of protections | Walkdowns, alarm rationalization, PSSR | Closeout of punch items, operator readiness, test records aligned to IEC 61511 |
Data Integrity and Governance

Good reviews rest on accurate, controlled documents. PFDs, P&IDs, line lists, relief device calculations, cause-and-effect matrices, and equipment datasheets must be current. Action tracking should be transparent, with owners, due dates, and closure evidence. Risk matrices must be calibrated to company tolerability criteria and should map to ALARP demonstrations where reductions become disproportionately costly. Most importantly, independence is key: the team that designs a safeguard should not be the only authority validating its adequacy.
How This Works in Practice on UAE Projects
Bringing those principles into the project room, the day-to-day reality blends structured workshops with focused technical studies and a lot of coordination. After concept selection, a HAZID framed around plot plan options highlights, for example, whether hydrocarbon inventories sit upwind of critical buildings, whether tank spacing accommodates foam pourers and dike capacity, or whether a compressor house risks congested, confined explosion scenarios. These early calls are cheaper now than post-steel.
During FEED, preliminary HAZOPs and design reviews align team mental models of the process. In a gas dehydration and compression project, the team might debate regeneration gas routing, evaluate HP/LP interface risks, and set the bones of the ESD segmentation strategy. Firewater hydraulics and detector layouts are typically matured here: are hydrants and monitors positioned for credible radiant heat scenarios? Does gas detection coverage account for wind, topography, and equipment congestion? A QRA may be scoped to quantify societal risk to nearby roads or communities.
When detailed design begins, documentation density increases: P&IDs are frozen enough for a full HAZOP, and operating modes (startup, shutdown, pigging, regeneration, maintenance bypass) are known. LOPA takes center stage for scenarios with serious consequence potential: e.g., blocked discharge on a reciprocating compressor leading to overpressure; reverse flow through a check valve; inadvertent overfill in an atmospheric tank. Where IPLs are insufficient, an SIS function is defined and targeted for SIL 1/2/3 per IEC 61511. That decision will shape architecture (1oo2, 2oo3), proof test intervals, and spares philosophy — all of which have lifecycle implications for maintenance teams.
Parallel sub-studies add realism. Hazardous area classification informs equipment selection and cable routing. Fire and gas mapping makes the detector layout defensible rather than anecdotal. Drainage and containment engineering addresses contaminated runoff and firewater management, crossing over into ISO 14001 concerns. Human factors design reviews ensure that valve handwheels, local control panels, and escape routes are usable in PPE during worst-credible events. For offshore or marine-adjacent assets, dropped object studies, blast/fire structural checks, and egress in heavy seas might be on the list. For desert sites, sand ingress, heat stress, and dust explosion potential in certain units (e.g., cement) must be considered.
Vendor packages present integration challenges. A packaged boiler or a high-speed compressor skid comes with its own safeguards, logic, and certification bases. Effective design reviews test that the package’s risk assumptions match the host facility’s reality: are blowdown paths compatible? Is the package SIS truly independent of the basic process control system (BPCS)? Does proof testing align with the plant’s turnaround intervals? Does the package HAZOP cover abnormal operations that the main plant depends on?
As commissioning approaches, action registers should be nearing closure, and a PSSR verifies that the as-built installation reflects the risk decisions captured through the reviews. Operators should have practiced shutdowns in realistic scenarios and validated alarm priorities. Firewater pumps should be tested to flows/pressures assumed in design. And perhaps most importantly, the risk narrative should be captured in a way that can be handed to operations and maintained through management of change (MOC).
Benefits and Practical Use Cases
Viewed holistically, the benefits of strong design hazard reviews extend far beyond a successful HAZOP closeout. They propagate through cost, schedule, compliance, and culture.
- Reduced late-stage rework: Catching that a flare KO drum needs additional surge capacity in FEED prevents expensive structural changes in construction.
- Optimized protective layers: LOPA-driven decisions can prevent over-specifying SIS where robust mechanical or procedural layers suffice, saving capital and complexity.
- Faster authority approvals: Evidence-based detector layouts, firewater demand calculations, and evacuation strategies smooth interactions with Civil Defence and Dubai Municipality.
- Insurer confidence: QRA results and bowties that clearly demonstrate ALARP often improve underwriting discussions and reduce surprises during surveys.
- Operational resilience: Thoughtful human factors and alarm rationalization reduce nuisance trips, improve operator decision-making, and speed up safe shutdowns and restarts.
- Sustainable performance: Integrating ISO 14001 and spill/containment design early reduces environmental incidents and remediation costs.
Concrete examples illustrate the point. In a crude storage terminal expansion, CFD-based dispersion modeling and LOPA support for overfill prevention can justify installing independent high-high level trips with SIL 2 targets, while demonstrating that foam system upgrades are adequate to keep risk within tolerable limits. In a power plant, integrating gas turbine trip logic with downstream HRSG protection avoids cold-end damage during fast trips and aligns proof testing with outages. In a polymer unit, dust explosion hazard identification leads to inerting and explosion relief design changes in conveying systems before procurement.
Best Practices and Points of Caution
Across many projects, several practical lessons recur. These best practices help teams stay disciplined and avoid common pitfalls.
- Anchor early reviews in inherently safer design. Eliminate, substitute, minimize, and simplify before relying on add-on protections.
- Define clear boundaries and nodes for HAZOP. Overly large nodes miss detail; overly small ones waste time. Calibrate to the complexity and hazard potential.
- Keep IPL independence real. A safeguard that depends on the same power source, instrument, or logic as the initiating cause is not independent.
- Use calibrated, company-approved risk matrices. Align consequence categories with actual harm potential (people, environment, assets, reputation) and map to ALARP decision-making.
- Integrate human factors. Consider access in PPE, valve operability, lighting, noise, and alarm floods during upset conditions.
- Align SIS lifecycle management to IEC 61511. From SRS quality through proof test coverage and bypass management, discipline here prevents risk creep in operations.
- Don’t forget cybersecurity. SIS and BPCS segregation, remote access policies, and secure configurations are part of modern barrier integrity.
- Document assumptions. When a LOPA credits an operator response or a relief valve, capture the basis, proof, and maintenance implications.
- Plan for SIMOPS and brownfield tie-ins. Temporary configurations during construction may invalidate IPL independence; analyze and compensate explicitly.
- Close the loop. Track, validate, and verify the closure of review actions with evidence before PSSR; random sampling by an independent reviewer helps.
Frequently Asked Questions About Design Hazard Review for New Processing Facility
How is a design hazard review different from a HAZOP?
A design hazard review is the overall program of risk-based evaluations that spans concept to pre-startup. HAZOP is a structured technique within that program, focused on node-level deviations and safeguards at the detailed design stage. A complete review program also includes HAZID, LOPA, SIL determination, QRA where needed, fire and gas mapping, human factors reviews, and PSSR.
When should each review happen during a project?
HAZID should occur during concept/feasibility and repeat at FEED if the plot plan or process basis changes. Preliminary HAZOP/design reviews usually happen in FEED when P&IDs take shape. Full HAZOP and LOPA occur in detailed design once P&IDs and operating modes are mature. SIL determination and SRS drafting follow LOPA. PSSR happens just before introducing hazardous energy or materials, once construction and commissioning are far enough along to validate safeguards.
Which standards guide SIS and SIL decisions?
IEC 61511 governs the SIS lifecycle in the process industries, including SIL assignment, SRS quality, proof testing, and MOC. LOPA is a common method to translate scenario risk into target SILs. API RP 14C can inform offshore logic, and API RP 750 frames process hazard management. Local UAE requirements and ADNOC codes will influence acceptance criteria and documentary expectations.
Do UAE authorities require QRA for every new facility?
No — QRA is often required for larger or higher-hazard installations, or where offsite risk to the public is a concern. Scope is typically agreed during FEED with the client and authorities. Smaller facilities may justify risk acceptability using semi-quantitative methods (LOPA, bowties) and solid compliance with codes (NFPA, hazardous area classification) without a full QRA.
How do environmental aspects fit into design hazard reviews?
Environmental risk is integral, not separate. Drainage and containment engineering, emergency retention capacity, air emissions control, and spill prevention tie directly to ISO 14001 and local environmental permitting. Environmental consequence categories should appear in the risk matrix, and LOPA/bowties should show barriers that protect soil, groundwater, and ambient air, not just people and assets.
What documentation is important for Civil Defence approvals?
Evidence typically includes firewater demand and hydraulic calculations, detector layouts and coverage justifications, foam system designs, material safety data references, hazardous material storage classifications, and evacuation strategies tied to occupancy and egress. Showing the logic from hazard identification to protection design — rather than only final drawings — improves confidence.
How is independence of layers of protection verified?
Independence is verified by analyzing common cause and common mode failures. For example, an IPL should not share sensors, logic solvers, power supplies, or final elements with the initiating cause. Documentation should show how proof testing, bypass management, and physical/functional segregation preserve that independence over time.
Can reviews be done remotely, or must everyone be in the room?
Hybrid models work well. Core HAZOP and LOPA sessions benefit from live, collaborative workshops with key disciplines present, often supported by real-time modeling or 3D reviews. Targeted follow-ups, vendor clarifications, and some action closures can be done remotely. The priority is quality participation, access to current documents, and disciplined facilitation and recording.
What role do bowtie diagrams play if we already have HAZOP and LOPA?
Bowties complement HAZOP/LOPA by visualizing the barrier set across threats and consequences, highlighting degradation factors and recovery measures. They are excellent for communicating with senior leadership, operators, and regulators, and for aligning assurance activities (inspection, testing, maintenance) to the barriers that matter most.
How do we keep the review from ballooning into endless scope?
Set clear objectives, timeboxes, and entry criteria for each review stage; freeze documents to specific versions; and prioritize scenarios by consequence and novelty. A good facilitator keeps discussions on-node and action-oriented, while a steering group arbitrates out-of-scope design debates.
Conclusion
A rigorous, well-governed design hazard review program gives project teams the confidence that their choices — from layout to logic — are risk-informed, standards-aligned, and operationally realistic. As discussed earlier, this is not a single workshop but a lifecycle of checkpoints: concept HAZID to embed inherently safer design; FEED reviews to set spacing, ESD, detection, and fire protection strategies; detailed HAZOP/LOPA to calibrate IPLs and define SIL; and PSSR to prove safeguards are real before start-up. Tying these to IEC 61511, NFPA, API, ISO standards and UAE regulatory expectations creates a coherent safety case that endures. NPM’s perspective is that the most reliable plants are built on this discipline: accurate documents, strong facilitation, credible independence, and relentless action closure. With that foundation, operational teams inherit a facility whose barriers make sense, are testable, and deliver ALARP performance day after day.
To go further on this topic, NPM’s broader Design Hazard Review Services UAE page covers this in more depth.
Our References
NPM’s references reflect a wide spectrum of process safety and HSE challenges across the world, from high-pressure gas processing and offshore platforms to chemical blending units, power plants, and distribution terminals. What unites these engagements is a commitment to credible, standards-based hazard reviews that result in safe, efficient facilities. In many cases, the work began with early-stage HAZID that reshaped plot plans to control escalation potential or reduce toxic exposure footprints. As projects matured, our teams supported or facilitated multi-discipline HAZOPs, integrated LOPA to right-size protective layers, and translated outcomes into IEC 61511-compliant SRS documents. We have helped operators align detector coverage with realistic dispersion patterns, right-size firewater systems to NFPA expectations, and robustly demonstrate ALARP in QRA or bowtie formats that resonated with both regulators and insurers. For brownfield expansions, we often addressed SIMOPS, bypass management, and independence challenges that emerge when legacy systems meet new plant sections. Whether the asset is a refinery unit, a cryogenic terminal, a district cooling plant, or a cement line, the thread through NPM’s portfolio is practical risk reduction anchored by accurate data, clear governance, and transparent decisions. By exploring our references, readers can see how these principles apply in different geographies, regulatory frameworks, and organizational cultures, and what it looks like when design hazard thinking is sustained through to commissioning and operations.
For more information about our references, visit Our References.
Speak with NPM
If you are evaluating how to structure or strengthen hazard reviews for a new build, we are happy to discuss the considerations raised in this article and how they map to your design stage, standards framework, and authority approvals. Whether you are at concept select or approaching PSSR, a brief conversation can help clarify next steps. For any further questions or to speak with our team, Contact Us.