Fire Safety References

Fire safety audits, detection and protection studies, and on-site supervision — from large industrial complexes to national hotel chains, ports, and public buildings.

Sector 01

Mining & Industrial Manufacturing

Fire risk studies and audits across mining, food processing, and specialty manufacturing sites, run against Moroccan fire safety regulation.

Ref.Client / SiteLocationScope of Work
FIR-001SACEM — Mining & ore-valorization plantMoroccoFire safety study
FIR-002SACEM — 4 mines & manganese treatment plantMoroccoFire safety audit
FIR-003THALVIN — Production plantMoroccoFire safety audit (Moroccan fire regulation)
FIR-004Éléphant Vert — Biofertilizers, biostimulants & biocontrol plantMoroccoFire safety audit + tender specification for upgrade works
FIR-005MATHE — Moroccan Teas & Infusions (packaging plant)BouskouraFire safety audit
FIR-006CIF — Compagnie Industrielle des Fibres (2 plants + warehouses)MoroccoFire upgrade study + tender specification
Sector 02

Chemical & Phosphate Processing

A long-running programme of fire detection, protection, and special-risk upgrade studies for OCP's Safi and Jorf Lasfar chemical and phosphate installations.

Ref.Client / SiteLocationScope of Work
CHM-001OCP — Maroc Chimie complexSafiFire upgrade study (detection, protection, special risks)
CHM-002OCP — MP1 complexSafiFire upgrade study (detection, protection, special risks)
CHM-003OCP — MP2 complexSafiFire upgrade study (detection, protection, special risks)
CHM-004Port of SafiSafiFire upgrade study
CHM-005OCP — New Sulfuric Acid Plant (SAP)Jorf LasfarFire detection & protection studies
CHM-006OCP — New phosphate washeryLahlassaFire detection & protection studies
CHM-007OCP — New phosphate washeryMerahFire detection & protection studies
CHM-008OCP — Fertilizer complex (ODI)OCP sitesDetailed fire protection studies
CHM-009OCP — 100 MVA transformersOCP sitesFire upgrade studies
CHM-010OCP — 60 kV electrical substations, Laâyoune storageOCP sitesFire upgrade studies
CHM-011OCP — "Sulfur Fusion" projectOCP sitesFire detection & protection studies
CHM-012OCP — Port installationsJorf LasfarFire upgrade study
CHM-013OCP — Petcoke conveyor (Port–plant link)Jorf LasfarFire protection & detection study
Sector 03

Ports, Aviation & Transport Infrastructure

Fire safety work on national logistics and transport infrastructure, from port terminals to airline ground-service facilities.

Ref.Client / SiteLocationScope of Work
TRP-001Tanger Med — Port installationsTangerFire safety audit + upgrade studies + tender specification
TRP-002Tanger Med — Port installationsTangerFire detection & extinction systems recommissioning study
TRP-003TGCC — Site base camp, Mohammed VI Tower projectMoroccoFunctional testing of fire detectors
TRP-004Atlas Servair (Royal Air Maroc Group subsidiary)MoroccoFire safety system refurbishment study
Sector 04

Public Infrastructure — Stadiums & Courts

From design study through tender launch to on-site supervision — full-lifecycle fire safety work on national sports and judicial buildings.

Ref.ProjectLocationScope of Work
PUB-0014 major national stadiumsMoroccoFire upgrade study + tender specification with financial estimate
PUB-0024 major national stadiumsMoroccoSite supervision of fire upgrade works — meetings, equipment validation, performance testing
PUB-0034 courthouse buildingsTanger & AssilahFire detection & protection design studies
PUB-0044 courthouse buildingsTanger & AssilahSite supervision of RIA installation — meetings, equipment validation, performance testing
Sector 05

Consumer Goods Distribution & Logistics

Société Marocaine des Tabacs (SMT) — fire safety audits across 40 sites in the company's national logistics footprint: warehouses, distribution centres, cross-docking hubs, and staff leisure facilities.

Ref.Facility TypeLocationsFire Safety Audit
SMF-001National PLV WarehouseMohammedia
SMF-002Distribution CentresAin Atiq, Casablanca, Khouribga, Marrakech, Agadir, Fès, Oujda, Ouarzazate, Laâyoune
SMF-003Cross-docking CentresTanger, Tétouan, Safi, Béni Mellal, El Jadida, Midelt, Meknès, Taza, Nador, Guelmim, Dakhla
SMF-004Staff Summer / Leisure CentresBouznika, Tamaris, Abdelmoula, Cabo Negro, Marrakech, Ifrane, Imouzzer
SMF-005Sports Complex & MAMACasablanca
Sector 06

Hospitality & Tourism

35 hotels across seven regions audited on-site against Moroccan fire safety regulation, from Tangier's coastline to Agadir's resort belt.

Ref.PropertyCity / RegionFire Safety Audit
HTF-001EurostarMorocco
HTF-002Vichy CélestinsBouznika
HTF-003Amphitrite Palace Resort & SpaSkhirate
HTF-004Sofitel Jardin des RosesRabat
HTF-005Ibis RabatRabat
HTF-006The ViewRabat
HTF-007Le Diwan Rabat — MGalleryRabat
HTF-008Onomo Rabat MedinaRabat
HTF-009Onomo Rabat TerminusRabat
HTF-010Ibis FèsFès
HTF-011Barcelo Fès MedinaFès
HTF-012SahraiFès
HTF-013VolubilisFès
HTF-014MarriottFès
HTF-015Michlifen Resort & GolfIfrane
HTF-016Ibis MeknèsMeknès
HTF-017Zaki Suites Hôtel & SpaMeknès
HTF-018Menzeh DaliaMeknès
HTF-019Mercure RifNador
HTF-020Ibis OujdaOujda
HTF-021MaamouraKénitra
HTF-022Vitality TerminusKénitra
HTF-023SultanaLarache
HTF-024Valeria Lixus Beach ResortLarache
HTF-025Ibis City CenterTangier
HTF-026Mövenpick Hotel & Casino MalabataTangier
HTF-027Grand MogadorTangier
HTF-028Hilton Tangier City CenterTangier
HTF-029Royal Tulip City CenterTangier
HTF-030Onomo Tangier MedTangier
HTF-031Hilton HouaraTangier
HTF-032Sofitel Tamuda Bay Beach & SpaTangier
HTF-033Villa LaymounOuled Taïma, Agadir
HTF-034Atlantica Park ComplexAgadir
Sector 07

Financial & Public Services

Fire safety audits for head-office buildings in the insurance and public-administration sectors.

Ref.Client / SiteLocationScope of Work
COR-001RMA — Royale Marocaine d'AssuranceCasablanca (3 HQ buildings + basements + archive facility)Fire safety audit
COR-002TGR — Trésorerie Générale du Royaume (Headquarters)MoroccoFire safety audit