Health & Safety at Work References

Over 180 site interventions across industry, hospitality, retail, energy, and public infrastructure — audits, internal emergency plans, and risk analyses built on decades of hands-on field experience.

Sector 01

Mining & Extractive Industries

Risk analysis and emergency planning for mineral extraction and quarrying operations, where ground conditions and heavy machinery raise the stakes.

Ref.Client / SiteLocationScope of Work
MIN-001TALPA — Groupe CADEX (Mining)MoroccoOHS audit & risk analysis of mining operations
MIN-002TALPA — Groupe CADEX (Mining)MoroccoRegulatory compliance audit (Moroccan H&S law)
MIN-003TALPA — Groupe CADEXMine site & warehouseInternal Emergency Plan (POI)
MIN-004Groupe H — QuarrySidi Tiji, SafiHSSE audit
Sector 02

Manufacturing & Industrial Processing

Cement, minerals, explosives, electrical equipment, agri-food and beverage plants — production environments where process risk and workplace safety intersect daily.

Ref.Client / SiteLocationScope of Work
MFG-001Cimenterie de TémaraTémara (quarry & plant)Hazard & risk analysis
MFG-002OMYA (Calcium carbonate manufacturing)MoroccoSite traffic & circulation plan
MFG-003INGELEC (Low-voltage electrical equipment)Casablanca — 5 plants + 4 warehousesFire safety diagnostic
MFG-004CADEX — Explosives production (2 plants)MoroccoISO 45001:2018 internal audit
MFG-005CADEX — Explosives production (2 plants)MoroccoRegulatory compliance audit
MFG-006Groupe H — Concrete plantHad SoualemHSSE audit
MFG-007Groupe H — AbattoirAgadirHSSE audit
MFG-008Groupe H — Citrus operationAgadir (Aït Iaâza)HSSE audit
MFG-009Groupe H — Azro siteAït Melloul, AgadirHSSE audit
MFG-010Groupe H — COPAG livestock farmAgadirHSSE audit
MFG-011Groupe H — Faraj siteAgadirHSSE audit
MFG-012Groupe H — Tizint siteTizintHSSE audit
MFG-013Groupe H — SiteOuarzazateHSSE audit
MFG-014Coca-Cola bottling plantAgadirInternal Emergency Plan (POI) + emergency drills
Sector 03

Automotive Manufacturing

Two full manufacturing lines audited for Faurecia Automotive Systems Technologies, both against internal ISO 45001 standards and Moroccan regulatory requirements.

Ref.Client / LineStandardScope of Work
AUT-001Faurecia — Automotive seats lineISO 45001:2018Internal OHS audit
AUT-002Faurecia — Automotive seats lineMoroccan lawRegulatory compliance audit
AUT-003Faurecia — Seat covers (textile & leather)ISO 45001:2018Internal OHS audit
AUT-004Faurecia — Seat covers (textile & leather)Moroccan lawRegulatory compliance audit
Sector 04

Engineering & Construction Services

Haroon Property Management Services (HPMS), Rabat — engineering, technical studies, and construction project management — audited across both health & safety and environmental management systems.

Ref.ClientStandardScope of Work
ENG-001HPMS, RabatISO 45001:2018Internal OHS audit
ENG-002HPMS, RabatMoroccan lawRegulatory compliance audit — H&S
ENG-003HPMS, RabatISO 14001:2015Internal environmental audit
ENG-004HPMS, RabatMoroccan lawRegulatory compliance audit — Environment
Sector 05

Energy — Oil, Wind & Solar

Fuel refining, wind farms, and solar plants audited to ISO 45001 and Moroccan regulation, plus emergency planning for renewable-energy construction sites.

Ref.Client / SiteLocationScope of Work
ENR-001SAMIR (Refinery)MoroccoAudit of furnace fuel-feed circuits + technical/safety upgrade specification
ENR-002COVEC — 3 photovoltaic plantsZagora, Missour, ErfoudInternal Emergency Plan (POI) + emergency drills
ENR-003EEM — 4 wind farmsAkhfennir, Foum El Oued, Al Houma, AftissatISO 45001:2018 audit
ENR-004EEM — 4 wind farmsAkhfennir, Foum El Oued, Al Houma, AftissatRegulatory compliance audit
ENR-005NAREVA — Wind farm constructionAftissatISO 45001:2018 audit
ENR-006NAREVA — Wind farm constructionAftissatRegulatory compliance audit
ENR-007TAREC — Wind farmTarfayaISO 45001:2018 audit
ENR-008TAREC — Wind farmTarfayaRegulatory compliance audit
Sector 06

Financial Services & Insurance

Head-office and site-level safety work for the insurance and banking sectors, including a fuel-handling risk study at the central bank's Dar Sekkah facility.

Ref.Client / SiteLocationScope of Work
FIN-001RMA — Royale Marocaine d'AssuranceCasablanca (3 HQ buildings + basements + archive facility)OHS audit
FIN-002RMA — Royale Marocaine d'AssuranceCasablanca (same facilities)Security audit
FIN-003Bank Al-Maghreb — Dar Sekkah siteMoroccoDiesel-unloading risk analysis & operating procedure
FIN-004Bank Al-Maghreb — Dar Sekkah siteMoroccoInternal Emergency Plan (POI), fuel-unloading zones
Sector 07

Business Services — Call Centres (BPO)

Occupational health & safety coverage for large-scale call-centre and customer-relationship operations.

Ref.Client / SiteLocationScope of Work
BPO-001Tele-Performance (Call centre operations)MoroccoISO 45001:2018 audit
BPO-002Tele-Performance (Call centre operations)MoroccoRegulatory compliance audit
Sector 08

Retail & Distribution

Hazard and risk analyses across the Carrefour and Label Vie retail network, plus an audit of the group's workplace-accident insurance declaration process.

Ref.SiteLocationScope of Work
RTL-001Carrefour Market — Yaacoub MansourCasablancaHazard & risk analysis
RTL-002CarrefourTémaraHazard & risk analysis
RTL-003Label Vie — Storage platformSkhirateHazard & risk analysis
RTL-004CarrefourSkhirateHazard & risk analysis
RTL-005CarrefourAïn Sebaâ, CasablancaHazard & risk analysis
RTL-006Carrefour AtacadaoAïn Sebaâ, CasablancaHazard & risk analysis
RTL-007CarrefourBouskouraHazard & risk analysis
RTL-008Label Vie / Carrefour Market GroupNationalAudit of workplace-accident insurance declaration management
Sector 09

Consumer Goods Distribution & Logistics

Société Marocaine des Tabacs (SMT) — a nationwide audit programme across the company's full logistics footprint: warehouses, distribution centres, cross-docking hubs, and staff leisure facilities, each covering both occupational health & safety and physical security.

Ref.Facility TypeLocationsH&S AuditSecurity Audit
SMT-001National PLV WarehouseMohammedia
SMT-002Distribution CentresAin Atiq, Casablanca, Khouribga, Marrakech, Agadir, Fès, Oujda, Ouarzazate, Laâyoune
SMT-003Cross-docking CentresTanger, Tétouan, Safi, Béni Mellal, El Jadida, Midelt, Meknès, Taza, Nador, Guelmim, Dakhla
SMT-004Staff Summer / Leisure CentresBouznika, Tamaris, Abdelmoula, Cabo Negro, Marrakech, Ifrane, Imouzzer
SMT-005Sports Complex & MAMACasablanca
Sector 10

Hospitality & Tourism

34 hotels across seven regions, each audited on-site for HSSE compliance and physical security — from Tangier's coastline to Agadir's resort belt.

Ref.PropertyCity / RegionHSSE AuditSecurity Audit
HTL-001Avanti HotelMohammedia—
HTL-002Vichy CélestinsBouznika
HTL-003Amphitrite Palace Resort & SpaSkhirate
HTL-004Sofitel Jardin des RosesRabat
HTL-005Ibis RabatRabat
HTL-006The ViewRabat
HTL-007Le Diwan Rabat — MGalleryRabat
HTL-008Onomo Rabat MedinaRabat
HTL-009Onomo Rabat TerminusRabat
HTL-010Ibis FèsFès
HTL-011Barcelo Fès MedinaFès
HTL-012SahraiFès
HTL-013VolubilisFès
HTL-014MarriottFès
HTL-015Michlifen Resort & GolfIfrane
HTL-016Ibis MeknèsMeknès
HTL-017Zaki Suites Hôtel & SpaMeknès
HTL-018Menzeh DaliaMeknès
HTL-019Mercure RifNador
HTL-020Ibis OujdaOujda
HTL-021MaamouraKénitra
HTL-022Vitality TerminusKénitra
HTL-023SultanaLarache
HTL-024Valeria Lixus Beach ResortLarache
HTL-025Ibis City CenterTangier
HTL-026Mövenpick Hotel & Casino MalabataTangier
HTL-027Grand MogadorTangier
HTL-028Hilton Tangier City CenterTangier
HTL-029Royal Tulip City CenterTangier
HTL-030Onomo Tangier MedTangier
HTL-031Hilton HouaraTangier
HTL-032Sofitel Tamuda Bay Beach & SpaTangier
HTL-033Villa LaymounOuled Taïma, Agadir
HTL-034Atlantica Park ComplexAgadir
Sector 11

Site Supervision Projects

Beyond audits, our teams supervise safety works directly on construction and infrastructure sites — validating equipment, running performance tests, and attending site meetings through completion.

Ref.ProjectLocationScope of Work
SUP-001Fire-safety upgrade works, 4 major stadiumsMoroccoSite meetings, equipment validation, performance testing
SUP-002Fire detection & protection (RIA) installation, 4 courthouse buildingsTangier & AssilahSite meetings, equipment validation, performance testing
SUP-003Vivo Energy — New JET fuel reservoir constructionBafra, SaléHSE site supervision
SUP-004Alstom — TGV line maintenanceBouznika – KénitraHSE site supervision
ehs-consulting-group

Explore Our Full Track Record

This is just one part of our work. Discover our complete portfolio of audits, certifications, and safety interventions across every sector we serve.