Occupied Building Risk Assessment for Refinery Expansion

Design Hazard Review for New Processing Facility

Occupied Building Risk Assessment for Refinery Expansion is a specialized topic that sits at the junction of process safety, civil/structural design, and operational readiness. When a refinery adds units, debottlenecks process trains, or ties in new utilities, the hazard profile around people-occupied structures changes — sometimes subtly, sometimes dramatically. This article explains what an occupied building assessment actually evaluates, how it is applied during brownfield expansion and revamp scenarios, which standards and local expectations matter in the UAE context, and how HSE and project teams can use the results to make defensible, risk-informed decisions.

Who Does This Affect?

Occupied Building Risk Assessment for Refinery Expansion

Expansions reshape risk around buildings where people work, pass through, or shelter. That brings a broad set of stakeholders to the table. At minimum, the topic concerns:

  • HSE managers and process safety engineers responsible for major accident hazard (MAH) management and compliance with ADNOC HSE requirements, OSHAD expectations, and Civil Defence interfaces.
  • Project directors, engineering managers, and discipline leads (process, civil/structural, mechanical, electrical/controls, fire and gas) tasked with layout and design decisions.
  • Operations and maintenance leadership who own headcount, shift patterns, and critical control room or substation occupancy.
  • Emergency response, security, and business continuity teams who plan muster, shelter-in-place (SIP), and evacuation.
  • Construction and turnaround managers coordinating temporary buildings, contractor villages, and staging areas during works.
  • Facility types most exposed in refinery contexts: central control rooms (CCR), satellite control rooms, analyzer shelters, substations/MCCs, laboratories, admin offices, workshops, warehouses, clinics, security gates, and temporary modular buildings or tents during shutdowns.

Because these teams often hold only part of the picture, success with building siting decisions depends on early alignment and continuous information sharing. What operations see as a minor headcount shift might be the difference between acceptable and intolerable risk when combined with a layout change.

Why This Matters

Occupied Building Risk Assessment for Refinery Expansion

Refinery expansions are rarely greenfield; they occur within live facilities surrounded by hydrocarbons, combustion sources, and pressurized equipment. Introducing new units (e.g., hydrocrackers, hydrogen plants, alkylation revamps) can alter inventories, raise congestion, tighten separation distances, and add potential leak or explosion sources. Meanwhile, occupied assets — CCRs, substations, labs — may remain in place, increasing the probability that people are exposed to thermal radiation, toxic dispersion, or blast overpressure if things go wrong.

Internationally, API Recommended Practices 752, 753, and 756 (permanent, portable, and tent structures respectively) guide the management of hazards from process plants to buildings. These are commonly paired with quantitative risk assessment (QRA), consequence modeling, and human vulnerability criteria aligned with recognized thresholds (e.g., 4–7 kW/m2 for tenability, AEGL/ERPG toxic endpoints, and structural damage thresholds at various overpressures). Within the UAE, ADNOC’s HSE Risk Management expectations, Dubai Municipality and Civil Defence permitting interfaces, and OSHAD requirements shape how these principles are embedded in design and operations. ISO 45001 and ISO 14001 management systems provide the procedural backbone, and IEC 61511/LOPA thinking about layers of protection helps structure the prevention side.

The objective is twofold: reduce risk to people in and around buildings to as low as reasonably practicable (ALARP), and document a reasoned, evidence-based trail that regulators and corporate assurance can follow. Without an explicit, up-to-date view of occupied building risk during an expansion, organizations risk suboptimal siting decisions, unexpected retrofits late in the project, operational restrictions that are costly to implement, or, worst of all, unrecognized exposure of personnel during a major event.

Key Points to Understand

Occupied Building Risk Assessment for Refinery Expansion

Refinery expansions tend to unfold in phases: design, enabling works, tie-ins, commissioning, ramp-up, and normal operation. An occupied building assessment has to acknowledge each phase because temporary states (e.g., bypassed safeguards; added congestions; temporary trailers) can elevate risk as much as the final steady state. Several foundational concepts frame the analysis:

1) The standards landscape

Occupied Building Risk Assessment for Refinery Expansion

API RP 752 addresses permanent buildings and promotes a structured approach: identify hazards, assess building performance against thermal, toxic, and blast loads, manage occupancy, and mitigate. API RP 753 covers portable structures, emphasizing separation from process areas and limitations on occupancy for trailers. API RP 756 applies to tents, commonly seen during turnarounds. NFPA codes (e.g., NFPA 30 for flammable liquids, NFPA 101 for life safety) may influence egress and fire protection features. These complement local obligations such as ADNOC’s CoPs for risk management and process safety, Civil Defence approvals for fire/life safety, and OSHAD systems for EHS governance.

2) Hazard and exposure modeling

Occupied Building Risk Assessment for Refinery Expansion

Explosion, fire, and toxic loads are estimated using recognized methodologies. For blast, congestion and confinement in new and existing pipe racks or unit modules can drive explosion overpressure and impulse; tools may range from simplified correlations to advanced CFD. For fire, radiation from jet and pool fires is assessed against tenability and structural criteria. For toxics, dispersion against AEGL-2 or ERPG-2 endpoints is typical, with HVAC isolation and SIP strategies considered. Results are mapped as contours over site layouts, intersecting with building footprints and egress paths.

3) Building performance and human vulnerability

Occupied Building Risk Assessment for Refinery Expansion

Buildings are not all equal. A blast-rated CCR with reinforced concrete, limited fenestration, and protected cable penetrations behaves very differently from a glazed office or a modular trailer. Occupied building assessment classifies buildings by structural robustness and function, then matches them to acceptable risk criteria (e.g., maximum overpressure, radiation flux, toxic dose) considering occupancy duration and the need to remain functional for command and control.

4) Occupancy and egress

Occupied Building Risk Assessment for Refinery Expansion

Headcount, shift patterns, and transient occupancy (e.g., toolbox talks, deliveries, maintenance) influence risk significantly. Egress routes must remain tenable long enough to evacuate or reach SIP/muster. Life safety thinking (NFPA 101) intersects with process safety loads here: doors opening direction, emergency lighting with UPS, blast-resistant vestibules, and the avoidance of glazing near exit routes. The assessment quantifies evacuation time versus hazard arrival time to judge whether evacuation or shelter is appropriate.

5) Phasing, temporary structures, and contractors

Occupied Building Risk Assessment for Refinery Expansion

Brownfield expansions add complexity through construction villages, portable trailers, fabrication yards, and tents for breaks or briefings. Per API RP 753 and 756, these should be sited outside hazard contours or subject to tight occupancy limits. Turnaround windows, when units are partially isolated, can yield abnormal inventories and configurations; the assessment must model representative worst-case but credible states during these windows as well.

6) Decision-making and ALARP

The assessment’s purpose is to inform choices: relocate or harden a building, limit occupancy, change layout, improve HVAC isolation, add gas detection or deluge, adjust muster strategy, or accept residual risk with documented justification. In the UAE, demonstrating ALARP typically requires transparent risk calculation, options evaluation, and consideration of ADNOC and Civil Defence feedback. Bowtie diagrams help visualize prevention and mitigation barriers, while LOPA rationalizes claims about safeguard performance.

For additional context on governance and risk-dialogue practices at leadership level, resources like CABINET NPM offer perspectives on decision accountability and documentation quality that complement technical analyses — useful when board or executive stakeholders need a concise view of risk trade-offs. These oversight elements do not replace technical work; they help ensure that the reasoning and records behind siting decisions are robust and review-ready.

7) Typical criteria used

While each operator sets its own risk tolerability, many assessments align to ranges such as individual risk tolerability bands and performance criteria for buildings and people. A simplified view is summarized below for illustration; real projects require company-approved criteria and regulator dialogue.

Building Type Key Hazard Drivers Example Acceptance Criteria Typical Mitigations if Exceeded
CCR (blast-rated) Explosion overpressure; toxic ingress ≤0.3–0.5 bar peak overpressure; HVAC auto-isolation at gas alarm; maintain functionality for command Structural strengthening; blast-rated doors; overpressure-rated penetrations; HVAC gas-tight dampers and shutdown logic
Substation/MCC Explosion overpressure; thermal radiation ≤0.2–0.3 bar; radiation at façade ≤7 kW/m2 Relocation; façade reinforcement; passive fire protection; reroute cabling
Laboratory Toxic ingress; glass breakage Maintain SIP; glazing fragment hazard controlled; AEGL-2 not exceeded inside Pressurization; gas-tight doors; laminated/film-treated glazing; fast-acting dampers
Admin Office Glazing vulnerability; egress blockage Radiation on egress ≤4–5 kW/m2; limited occupancy within hazard contours Relocate outside contours; reduce glazing; create shielded egress routes
Portable Trailer Close-coupled hazards; low structural capacity Outside hazardous contours or strict time/occupancy limits per API RP 753 Move to safe zone; upgrade to blast-rated modular; enforce duration limits
Tent Fire radiation; rapid collapse Not permitted within hazard contours per API RP 756 Relocate; replace with rated shelter

These thresholds must be reconciled with corporate risk criteria (e.g., individual and societal risk guidelines, F–N curves) and the facility’s emergency response doctrine.

How This Works in Practice

Translating the principles above into day-to-day project decisions requires timing, data discipline, and coordination. Once preliminary layouts exist, hazard source inventories are compiled: storage tanks, flare systems, reactors, compressors, furnaces, and transfer lines. Early consequence calculations plot first-pass contours for thermal, blast, and toxic exposures, focusing on delta risk created by the expansion relative to the current baseline. This is when easy wins appear — e.g., nudging a substation 20 meters, rotating a building to reduce glazing exposure, or moving temporary trailers to the cold side of prevailing winds.

As the design matures, the assessment deepens: ignition probabilities, congestion characterization, and escalation potential (domino effects) are refined. Bowtie and HAZID inputs ensure credible scenarios; HAZOP and LOPA outcomes verify safeguards assumed in frequencies. For buildings that must remain, structural engineers review anchorage, wall systems, partitions, door hardware, and cable penetrations. For CCRs and labs, HVAC behavior under toxic or smoke alarms is tested against modeled arrival times: can dampers close, recirculation switch on, and fresh air block fast enough? Electrical teams examine UPS coverage for egress lighting and detection systems. These points are not academic; an overpressure-rated door without reinforced frame anchorage can become a failure point.

Construction and turnaround phases demand special attention. During tie-ins, local inventories can increase while units are in abnormal configurations; safeguards (e.g., ESD valves) may be temporarily bypassed. Contractors often request trailers closer to work fronts; API RP 753 risk checks and occupancy limits should be enforced, and alternative communication strategies arranged if distance increases travel time. For tents, the rule of thumb is simple: do not place within hazard contours. Where space is constrained, the assessment can justify shuttle schedules, staggered breaks, or repurpose blast-rated modular buildings as temporary offices.

Because UAE projects typically interact with Civil Defence for fire/life safety approvals and with ADNOC or major operators’ technical authorities for process safety reviews, documentation clarity matters. Plots showing before/after contours, tabulated headcount by building and shift, and ALARP option evaluations help reviewers see the logic chain. When a residual risk is accepted (e.g., a CCR left in place with additional hardening), the rationale should align with corporate tolerability criteria and include a maintenance/assurance plan for the barriers relied upon.

Benefits and Practical Use Cases

Organizing the analysis as above pays practical dividends — not just in compliance, but in design efficiency and operational confidence.

  • Risk visibility: Overlaying hazard contours with building layouts clarifies which structures drive exposure and where marginal relocations buy large risk reductions.
  • Design integration: Structural, architectural, HVAC, and electrical decisions gain objective targets (e.g., glazing type, door ratings, damper closing times, UPS durations).
  • Construction safety: Portable building governance avoids ad hoc siting under schedule pressure, reducing last-minute conflicts and rework.
  • Emergency effectiveness: Clear, tested SIP and egress strategies avoid contradictory instructions during incidents; muster points are placed with tenability in mind.
  • Assurance and regulator dialogue: A well-documented, standard-aligned rationale helps interactions with ADNOC HSE oversight and Civil Defence approvals proceed smoothly.

Common refinery expansion scenarios illustrate how the approach is applied:

Adding a hydrocracker or hydrogen unit: High-pressure hydrogen systems introduce explosion potential with fast overpressure rise. If the nearest substation sits within the new explosion contour, options include relocating the building, adding blast reinforcement, or re-routing equipment to reduce congestion and confinement.

Revamping an FCC: Hot circulation lines and large inventories can elevate radiation exposures during certain fire scenarios. If a lab or office sits downwind, HVAC shutdown and SIP sealing might be prioritized, coupled with reorienting egress routes behind shielding or berms.

New LPG bullets or spheres: Toxic/flammable gas releases shift dispersion contours. Control rooms with fresh-air intakes facing the new bullet farm may need intake relocation, higher-spec dampers, and automated gas detection interlocks.

Turnaround villages: With dozens of contractors on site, portable trailers tend to creep inward toward work faces. A simple mapping of 5–7 kW/m2 radiation and toxic endpoints, backed by clear rules from API RP 753/756, prevents unsafe encroachment and keeps occupancy within limits.

Best Practices and Points of Caution

Several practical tips consistently improve outcomes and reduce late surprises:

  • Start early with credible but conservative contours to inform layout; refine as design matures rather than waiting for perfect data.
  • Integrate the assessment with HAZOP, LOPA, and QRA to ensure scenario frequencies and safeguards are consistent across disciplines.
  • Treat CCRs and essential substations as lifelines: target higher performance criteria and verify survivability and functionality, not just occupant protection.
  • Model construction and commissioning states explicitly; do not assume final steady-state represents the worst credible risk.
  • Govern portable buildings rigorously per API RP 753; apply occupancy limits and movement controls, and avoid exceptions “for a few weeks” that tend to become permanent.
  • Design egress with blast and radiation in mind: minimize glazing along exit paths, provide lighting on UPS, and consider shielded corridors where contours are tight.
  • Plan for HVAC behavior under toxics: specify fast-acting dampers, gas-tight seals, and automatic isolation tied to reliable gas detection logic.
  • Verify details: door and frame anchorage, wall connections, ceiling diaphragms, cable tray penetrations — many failures occur at the connections, not in the panel itself.
  • Align documentation with ADNOC and Civil Defence expectations; present ALARP option evaluations transparently to ease approvals.
  • Maintain a living register of buildings, occupancy, and risk status tied to Management of Change (MOC); revisit the assessment when headcount or layout changes.

On the caution side, common pitfalls include relying on outdated QRAs that don’t reflect new inventories, assuming laminated film on standard glazing equates to blast resistance, overlooking egress route tenability during high radiation events, and treating temporary tents as harmless if “only for breaks.” Each of these has been implicated in past incident learnings across the industry.

Frequently Asked Questions About Occupied Building Risk in Refinery Expansions

How is an occupied building assessment different from a facility QRA?

A QRA estimates overall individual and societal risk across the site, while an occupied building assessment focuses specifically on loads impacting buildings and people within them, including structural response, occupancy patterns, and egress or shelter strategies. The assessments are complementary: the QRA informs frequency and consequence data; the building assessment applies that information to siting and performance decisions.

Which standards should we reference for occupied buildings?

API RP 752 covers permanent buildings, API RP 753 governs portable structures (e.g., trailers), and API RP 756 addresses tents. For life safety and egress, NFPA 101 provides relevant guidance. In the UAE, align with ADNOC’s HSE Risk Management and Process Safety expectations, OSHAD management system requirements, and engage with Civil Defence on fire/life safety aspects. ISO 45001 supports organizational governance.

What overpressure or radiation limits are typically applied?

There is no universal single set, but common practice uses ranges like 0.2–0.5 bar for building performance, ≤7 kW/m2 at façades, and 4–5 kW/m2 for egress path tenability, with adjustments for occupancy duration and building criticality (e.g., CCRs). Toxic exposure is typically assessed against AEGL or ERPG thresholds, with HVAC isolation and SIP considered. Company and regulator criteria prevail.

How often should the assessment be updated?

At minimum: at each major design gate during the expansion project; before construction mobilization to govern temporary buildings; prior to commissioning; and after ramp-up to confirm steady-state conditions. Thereafter, review under MOC whenever occupancy, building use, inventories, or layouts change, and periodically to reflect updated standards or operating experience.

Do portable trailers have to be blast-rated?

Not necessarily; API RP 753 prioritizes segregation — keeping trailers out of hazardous contours. Where segregation is infeasible, occupancy limits, enhanced construction, or substitution with blast-rated modular buildings may be considered, but justification is required and critical functions should not be housed in trailers within hazard zones.

How do HVAC and SIP strategies factor into acceptance?

They are central for toxic scenarios. The assessment compares toxic arrival times to damper closing and system switching times, checks leakage and pressurization capability, and ensures SIP rooms are sized for expected headcount. Detection reliability and power continuity are part of the argument for acceptability.

What role does egress modeling play?

Egress modeling estimates how long people take to reach safe areas and whether routes remain tenable given radiation, smoke, or debris. It guides door placement, corridor protection, lighting on UPS, and the decision to evacuate versus shelter. It also confirms that muster points themselves sit outside hazard contours.

Can we rely on glass films for blast protection?

Films can improve fragmentation behavior but do not convert standard glazing systems into blast-rated assemblies. True performance depends on the entire system — glass, frame, anchorage, and supporting structure. Many injuries in incidents stem from glazing failure; treating film as a substitute for proper design is a known pitfall.

How do regulators in the UAE view these assessments?

Expectations focus on alignment with recognized practices, transparent ALARP reasoning, and clear documentation. ADNOC technical authorities and Civil Defence reviewers respond well to assessments that demonstrate scenario credibility, defend frequency assumptions, and show that alternatives were considered and recorded, especially for buildings critical to emergency response.

Conclusion

As refinery expansions layer new inventories, equipment, and congestion onto live assets, the risk landscape around where people work and make decisions inevitably changes. An occupied building assessment ties together consequence modeling, building performance, occupancy, and egress to produce clear, defensible actions — relocate or harden structures, adjust headcount, refine HVAC and SIP logic, or reshape layouts. Referencing API RP 752/753/756 and integrating with HAZOP, LOPA, and QRA keeps the analysis technically sound; engaging early with ADNOC expectations and Civil Defence interfaces ensures the reasoning is review-ready. Most importantly, treating construction and commissioning phases with the same rigor as the final configuration prevents blind spots when risk can be highest.

If your site is embarking on a brownfield project, taking time to frame criteria, map credible scenarios, and align key stakeholders will make decisions faster and more robust later on. The methods outlined above are not a checklist but a way to think through people, buildings, loads, and timing in a way that stands up to scrutiny and protects life while enabling growth.

To go further on this topic, NPM’s broader Occupied Building Risk Assessment Services UAE page covers this in more depth.

Our References

NPM’s track record with occupied building assessments and broader process safety studies spans complex brownfield and greenfield industrial environments worldwide. Our teams have contributed to projects involving refinery revamps, petrochemical unit additions, utility modernization, LNG and LPG storage expansions, and multi-year turnaround programs where temporary occupancy management was pivotal. While every site is unique in its equipment, layout, and organizational culture, the underlying logic is consistent: align with recognized practices like API RP 752/753/756, model credible loads with clarity, translate results into architectural and engineering actions, and document ALARP reasoning transparently. Across various operators and jurisdictions, this disciplined approach has helped clients reconcile tight spatial constraints, maintain operational continuity, and reach regulator-ready outcomes without resorting to unnecessary overdesign. The reference materials you will find demonstrate how robust building criteria, pragmatic layout adjustments, and targeted retrofits can reduce risk significantly with proportionate cost and schedule impact. They also show how assessments were kept “alive” through construction and commissioning, ensuring temporary villages, trailers, and tents never drifted into red zones. Whether the challenge involved repositioning a substation near a new hydrogen unit, hardening a legacy CCR to withstand elevated overpressure, or redesigning egress to stay tenable under higher thermal radiation, the common thread is a balance of rigor and practicality. We invite you to explore examples that illustrate not only technical depth but also the clarity of communication and stakeholder alignment that characterize NPM’s work product.

For more information about our references, visit Our References.

Speak with NPM

If you are evaluating how a planned refinery expansion could alter risk around control rooms, substations, laboratories, or temporary facilities, a short conversation can help frame the right questions and data needs. We are glad to discuss criteria, typical pitfalls, and how to structure assessments so decisions are timely and defensible. For any further questions or to speak with our team, Contact Us.