Process Safety References

HAZOP, HAZID, SIL, and ATEX studies for high-risk process installations — refineries, chemical plants, and phosphate and mineral processing sites.

Sector 01

Oil, Gas & Refining

Process hazard studies on hydrocarbon storage, transport, and refining assets — where a single unrecognised deviation can cascade fast.

Ref.Client / InstallationLocationScope of Work
PSF-001SAMIR — Oil refinery (operational units, hydrocarbon storage & transport)MoroccoHAZOP study
PSF-002Vivo Energy — Petroleum storage depotTan-TanHAZOP study
PSF-003Vivo Energy — Petroleum storage depotTan-TanHAZOP of Change
PSF-004Sound Energy — Tendrara gas field transfer to treatment plantMoroccoHAZOP study
Sector 02

Chemical Manufacturing — Sulfuric Acid & Ammonia

Process safety coverage of OCP's Jorf Lasfar sulfuric acid and ammonia production chain, including third-party contractor studies.

Ref.Client / InstallationLocationScope of Work
AMM-001OCP — New Sulfuric Acid Plant (SAP)Jorf LasfarHAZOP study
AMM-002OCP — New Sulfuric Acid Plant (SAP)Jorf LasfarATEX study
AMM-003OCP — Ammonia line, storage tank to DAP facilitiesOCP sitesHAZOP study
AMM-004OCP — Ammonia production plantJorfHAZOP study
AMM-005CEMTEC — Phosphate grinding unit, DAP 107 E&F (OCP site)OCP sitesHAZOP study facilitation
Sector 03

Phosphate & Mineral Processing

Full-package risk coverage — fire, process hazard, and explosive-atmosphere studies — for two of OCP's newest phosphate and sulfur project lines.

Ref.Client / InstallationLocationScope of Work
LAY-001OCP — New phosphate washeryLaâyouneFire detection & protection studies
LAY-002OCP — New phosphate washeryLaâyouneHAZOP study
LAY-003OCP — New phosphate washeryLaâyouneATEX study
LAY-004OCP — "Sulfur Fusion" projectOCP sitesHAZOP study
LAY-005OCP — "Sulfur Fusion" projectOCP sitesATEX study
Sector 04

Fertilizer Manufacturing & Hazard Studies

Hazard and process studies for OCP's fertilizer production complexes at Jorf Lasfar and Safi, plus gas-treatment installations audited on behalf of contracting partners.

Ref.Client / InstallationLocationScope of Work
ODI-001OCP — Fertilizer chemical complex (ODI)JorfHAZOP study
ODI-002OCP — Fertilizer chemical complex (ODI)Jorf LasfarHazard study (Étude des Dangers)
ODI-003OCP — New fertilizer chemical complexSafiHazard study (Étude des Dangers)
ODI-004OCP — Gas treatment installationSafiHAZOP study
ODI-005OCP — Gas treatment installation, on behalf of ServithenSafiHAZOP study
Sector 05

Water & Desalination Infrastructure

A single strategic pipeline project — moving desalinated seawater from Jorf Lasfar to OCP's phosphate washing plants at Khouribga — covered end to end across hazard identification, operability, and safety-integrity assessment.

Ref.Client / ProjectRouteScope of Work
DES-001OCP — Desalinated seawater transferJorf Lasfar → KhouribgaHAZID study (Hazard Identification)
DES-002OCP — Desalinated seawater transferJorf Lasfar → KhouribgaHAZOP study (Hazard & Operability)
DES-003OCP — Desalinated seawater transferJorf Lasfar → KhouribgaSIL study (Safety Integrity Level)
Sector 06

Multi-Sector Studies — FMCG, Automotive Supply & Chemicals

Front-end engineering design safety work and process risk studies spanning phosphate processing, FMCG, and automotive cable manufacturing clients.

Ref.Client / ProjectLocationScope of Work
MLT-001OCP — "Pilot Plant" projectOCP sitesFEED studies: risk analysis, HAZOP, HAZID, fire protection, safety showers, safety distances, ATEX zoning
MLT-002Unilever — Production installationsMoroccoHAZOP risk studies
MLT-003COFICAB — Automotive wire & cable manufacturing (3 sites)TangerATEX study
ehs-consulting-group

Explore Our Full Track Record

This is just one part of our work. Discover our complete portfolio of audits, certifications, and safety interventions across every sector we serve.