“What Is What If Analysis?” is a question that arises often among HSE, engineering, and operations leaders responsible for preventing incidents and ensuring regulatory compliance in the UAE’s high-hazard sectors. At its core, the method is a structured, scenario-based brainstorming technique used to uncover what could go wrong in a process, system, or activity — and what can be done about it. It is widely applied throughout the lifecycle of industrial assets, from early design and construction through commissioning, routine operations, and management of change, and it helps organizations translate practical “what if…?” prompts into concrete safeguards and actions.
Who Does This Affect?

Because it cuts across technical, operational, and organizational interfaces, this topic concerns a wide set of roles and facility types. In the UAE industrial context, the practice is particularly relevant to:
- HSE managers, process safety engineers, and operations managers responsible for ISO 45001 and ISO 14001 management systems and for demonstrating compliance to local regulators such as OSHAD, Dubai Municipality, Civil Defence, and MOHRE.
- Process engineers and control engineers working under IEC 61511 and API recommended practices (e.g., API RP 14C, API RP 750) for refineries, gas processing facilities, offshore platforms, and pipelines.
- Plant managers in petrochemical complexes, power and desalination plants, and energy-from-waste facilities who must manage risks around high-pressure systems, hazardous chemicals, and complex interlocks.
- Construction directors and site supervisors overseeing high-rise projects, tunneling works, and temporary works where method statements and permits-to-work need robust hazard identification.
- Maintenance and reliability teams planning turnarounds, isolations, and invasive work where deviations can create simultaneous operations (SIMOPS) risks.
- Warehouse and logistics operators handling flammable liquids, pressurized cylinders, or hazardous materials in storage terminals and distribution hubs.
Beyond line functions, this concerns project management offices, procurement teams, and contractors — especially when responsibility for process safety is shared across EPC consortia or when interface risks must be managed across multiple parties.
Why Does This Question Matter?

The importance of this technique is not academic. Scenario-driven hazard identification directly supports prevention of major accidents and occupational injuries, and it underpins compliance with standards and regulations that UAE-based operators recognize. For example, ADNOC’s HSE requirements and OSHAD-SF frameworks expect systematic identification and mitigation of hazards; What-if thinking is a practical way to demonstrate that hazardous scenarios were considered, evaluated, and addressed. It also provides an accessible gateway into more formal risk assessment methods, helping teams decide where advanced studies such as HAZOP, LOPA, Bowtie analysis, or Quantitative Risk Assessment (QRA) are warranted.
Equally important, the approach opens the conversation to frontline experience. Control room operators, commissioning engineers, and permit coordinators often understand idiosyncratic failure modes that rarely make it into design documents. A structured set of “what if” prompts captures this tacit knowledge, connects it with process safety principles, and turns it into actionable safeguards — whether that means procedural defenses like lockout-tagout and SIMOPS controls, or engineered layers such as alarms, trips, and relief systems. In short, getting this right improves risk reduction, operational continuity, and regulatory confidence.
Key Points to Understand

Before discussing how it plays out in the field, it helps to unpack the method’s essentials and how it aligns with allied techniques recognized across oil and gas, petrochemicals, power, and construction.
What the method is — and isn’t

A What-if review is a structured workshop where a multi-disciplinary team asks a series of prompted questions about a process, operation, or activity. Prompts typically begin with “What if…?” followed by a deviation or failure condition. Each scenario is explored for potential causes, consequences, existing safeguards, and recommendations. The method is flexible and can be qualitative or semi-quantitative, depending on how the organization ranks risk and assigns priority. It is not a replacement for HAZOP where detailed design and P&IDs are available; rather, it is often used earlier in the lifecycle or for topics where HAZOP might be disproportionate — for example, during construction phases, SIMOPS planning, or management of change.
Inputs and boundaries

The quality of outputs depends on clearly defined scope and robust inputs. Typical references include P&IDs and cause-and-effect matrices, plot plans, method statements, lifting or excavation plans, chemical inventories and MSDS, shutdown philosophies, instrumented safeguards (SIS) design intent per IEC 61511, and the organization’s HSE risk criteria. Scoping decisions — such as whether to include upstream/downstream interfaces or emergency response — should be made upfront so the team’s time is focused.
Team composition and roles

Effective sessions blend operations insight with design intent. Core participants often include a facilitator with process safety experience, a scribe who documents scenarios and actions, subject-matter experts (process, mechanical, E&I, control systems), operations and maintenance representatives, and HSE/permit coordinators. For construction or shutdown reviews, contractor supervisors and lifting/rigging specialists also play a crucial role.
Prompt libraries and scenario development

Prompts can be generic (loss of containment, loss of utilities, human error) or system-specific (blocked vent, failed interlock, valve left open). Over time, organizations develop prompt libraries informed by incident learning, near-miss data, and industry guidance. In UAE operations, common prompts include loss of instrument air, degraded firewater coverage during SIMOPS, sand production in gas wells, HVAC failure affecting hazardous area classification, and power dips that challenge UPS switchover.
Documentation and risk ranking

Outputs should be recorded in a structured format, typically capturing: the scenario, initiating causes, potential consequences, existing safeguards (engineered, procedural, and organizational), risk ranking using the company matrix, and recommendations with accountable owners and target dates. Where instrumented functions are involved, the study may flag scenarios for LOPA or SIL verification against IEC 61511 target integrity levels.
How it complements other methods
Each hazard analysis technique has its place. The table below summarizes where What-if analysis sits alongside other commonly used methods in the UAE industrial context.
| Technique | Trigger/Prompt Style | Typical Use Stage | Strengths | Limitations |
|---|---|---|---|---|
| What-if | Scenario prompts (open-ended questions) | Concept, FEED, construction, commissioning, operations, MOC | Flexible, fast to start, accessible to non-specialists, good for SIMOPS and procedures | Less systematic than HAZOP on detailed design; depends on team experience |
| HAZID | Guidewords/categories (external events, environment, logistics, etc.) | Concept/FEED | Broad coverage early in project, identifies showstoppers | Qualitative; follow-on studies required |
| HAZOP | Parameter/guideword deviations (e.g., Pressure–High) | Detailed design/operations with P&IDs | Systematic coverage of process deviations, strong documentation | Time-intensive; less suited to construction/SIMOPS |
| LOPA | Event chain with initiating frequency and IPLs | Post-HAZOP or targeted SIL verification | Quantifies risk reduction, aligns with IEC 61511 | Requires data discipline and defined corporate criteria |
| Bowtie | Threat–top event–consequence visualization | Operations, emergency response, barrier management | Communicable picture of barriers and degradation factors | Needs upkeep to remain accurate |
Where to find governance and context
While What-if analysis is technique-neutral, it should be embedded in a company’s HSE management system alongside ISO 45001 and ISO 14001 processes. In the UAE, alignment with ADNOC guidance for major accident hazard management and with OSHAD-SF requirements for risk assessment is common practice. Industry codes such as API RP 14C and NFPA standards influence prompt libraries, especially for fire and explosion scenarios. For additional perspectives from within the broader NPM ecosystem, practitioners often consult resources like CABINET NPM when developing internal prompts, governance notes, or checklists — as a complement to internal procedures and regulatory requirements.
How Does This Work in Practice?
Once the essentials are clear, the practical rhythm of a What-if review becomes straightforward. Whether applied to a new pipeline pigging procedure or a temporary diesel generator feeding critical loads during a shutdown, the team follows a consistent pattern.
Scoping and preparation
Practical work begins by defining the system boundaries and assembling the right inputs. For a process unit, this may mean the battery limits on P&IDs, control narratives, trips and alarm setpoints, and recent incident learnings. For a construction method statement, it might include lifting plans, traffic management layouts, and utilities tie-in schedules. Pre-reading helps participants arrive with mental models already formed.
Prompt-driven exploration
The facilitator uses a curated list of prompts relevant to the scope. Consider a crude storage tank nitrogen inerting operation. Scenarios might include: “What if nitrogen supply pressure is lost?”, “What if oxygen sensors are miscalibrated?”, “What if the inerting hose disconnects?”, “What if a hot work permit is issued nearby?” For each, the team explores credible causes, consequences (from off-spec product to flammable atmosphere formation), existing safeguards (interlocks, oxygen monitoring, gas testing, permit-to-work), and potential enhancements.
Risk ranking and action capture
Using the organization’s risk matrix, the team ranks the scenario both with current safeguards and with any added recommendations. Actions receive owners, due dates, and a clear verification method — e.g., updating the permit template to require a specific gas test frequency, or commissioning a check of SIS proof test intervals to confirm alignment with IEC 61511 assumptions.
Interface and SIMOPS awareness
Many UAE facilities are complex campuses. SIMOPS challenges arise when construction, operations, and maintenance share space — think hot tapping while adjacent units remain live, or crane lifts across hydrocarbon lines. What-if prompts help reveal overlooked interface risks, such as degraded firewater coverage during isolation or emergency egress routes obstructed by temporary works, enabling temporary barriers (fire watch, portable monitors, PA/GA checks) and rescheduling.
Verification and follow-through
A study is only as strong as its follow-through. The best practice is to integrate the action log with the company’s corrective action system, link actions to permits, and verify closure. Spot checks, management walkdowns, or pre-startup safety reviews (PSSRs) confirm that recommendations have been implemented as intended. Where outcomes affect instrumented functions, a LOPA or SIL review ensures the desired risk reduction is achieved.
Benefits and Practical Use Cases
The value of this method becomes visible when applied to real operations. Beyond compliance, it often improves practicality, clarity, and inter-team coordination.
- Design resilience: Early-stage prompts uncover layout or utility single-point failures (e.g., a single firewater header feeding multiple critical monitors) before they are locked into the design.
- Operational reliability: For existing assets, scenario thinking identifies latent conditions — for example, a permissive bypass left in place after maintenance, or an alarm flood masking critical annunciations.
- Construction safety: Method statement reviews surface risks around temporary power, excavation stability near existing services, or lifting in congested areas.
- Emergency preparedness: Prompts like “What if access for Civil Defence is blocked during a simultaneous lift?” lead to preemptive coordination with site logistics and emergency teams.
- Regulatory confidence: Documented, structured thinking aligns with expectations from ADNOC, OSHAD, and municipal authorities, demonstrating due diligence in risk management.
Concrete use cases that resonate in the UAE include:
- Offshore gas dehydration: “What if glycol circulation is lost during high H2S conditions?” leading to checks on shutdown logic, portable gas detection, and emergency escape breathing device staging.
- Refinery turnaround SIMOPS: “What if inerted equipment is opened prematurely?” prompting improved isolation verification, nitrogen bleed checks, and revalidation of confined space permits.
- High-rise construction: “What if a tower crane boom slews over an energized substation?” driving exclusion zones, interlock verification, and weather-wind hold points.
- Warehouse operations: “What if racking collapse occurs near flammable liquid storage?” resulting in revised stacking limits, traffic control, and foam fire protection reassessment.
- Power generation: “What if black start diesel fails during GT trip?” encouraging reliability-centered maintenance and test frequency adjustments for emergency systems.
Indirect benefits also appear: cross-functional understanding improves; action ownership is clearer; and the organization builds a living prompt library informed by incidents, near-miss data, and lessons learned from both internal experience and industry literature.
Best Practices and Points of Caution
Attention to a few fundamentals markedly improves the quality and credibility of outcomes. The following practices distill lessons NPM sees across projects and operations:
- Define boundaries early: Make sure everyone understands what is in and out of scope, including interfaces, temporary works, and emergency response aspects.
- Use a curated prompt set: Start with a focused list tailored to the system — loss of containment, utility failures, human-machine interaction, permit deviations, environment, and external events — then expand based on the discussion.
- Build the right team: Include operations and maintenance voices, not just design engineers. For construction, involve lifting supervisors, scaffold leads, and permit coordinators.
- Tie to corporate risk criteria: Align risk ranking with your company’s matrix and tolerability criteria so that prioritization is transparent and defensible.
- Document assumptions: Record why a scenario is considered credible or not, and what evidence supports safeguard effectiveness (P&ID references, proof test intervals, competency requirements).
- Validate in the field: When feasible, conduct a short site walkdown to confirm isolation points, egress routes, and equipment conditions match the mental model used in the room.
- Integrate with MOC and PSSR: Ensure recommendations that modify design or procedures are captured in management of change workflows and verified before start-up.
- Avoid groupthink: Encourage contrary prompts and invite quiet participants to contribute. Rotating the prompt owner helps surface different perspectives.
- Manage action quality: Each recommendation should have a clear purpose, owner, due date, and verification method. Avoid vague “train people” actions without specifying competency outcomes or materials.
- Keep momentum: Use short, regular sessions over marathon workshops for complex scopes. Attention and quality stay higher, and action closure can start sooner.
A final caution: a What-if session is not a box-ticking exercise. Over-reliance on generic prompts without system-specific thinking leads to superficial outputs. Conversely, trying to turn the session into a HAZOP substitute at detailed parameter-level rigor dilutes the agility that makes this method valuable. The art is to be thorough where it matters and pragmatic where the risk profile is low.
Frequently Asked Questions About What‑If Analysis
Is What‑if analysis the same as HAZOP?
No. HAZOP is a structured, parameter-based method typically applied to detailed design with P&IDs, using guidewords like “Flow–No” or “Pressure–High.” What‑if analysis is more open-ended and scenario-focused, making it well suited to early design, construction, operations, and management of change. Many organizations use What‑if to decide where a formal HAZOP or LOPA is needed.
How detailed should the prompts be?
Prompts should be specific enough to trigger meaningful discussion but not so narrow that they pre-judge causes or solutions. “What if instrument air is lost to the compressor area?” is better than “What if PCV-123 fails?” early in design. As the team gains clarity, prompts can become more granular, especially for critical steps or high-hazard operations.
Who needs to attend a session?
At minimum: a facilitator, a scribe, process or construction engineers, operations or site supervisors, maintenance representatives, and HSE/permit coordinators. For specialized topics (e.g., lifting over live plant, SIL-rated interlocks), include subject-matter experts like rigging engineers or control system specialists.
What inputs do we need to start?
For process systems: P&IDs, cause-and-effect matrices, control narratives, alarm and trip setpoints, plot plans, hazardous area classifications, and recent incident learnings. For construction: method statements, lifting plans, temporary utility layouts, traffic plans, and permit templates. Company risk criteria and barrier management expectations should be available for consistent ranking.
How are actions prioritized?
Use the corporate risk matrix to rank scenarios with existing safeguards, then assess how proposed recommendations reduce risk. Focus first on high and intolerable risks, particularly those with potential for major accident hazards (fire, explosion, toxic release) or significant environmental impact. Consider regulatory expectations (e.g., Civil Defence access, ADNOC HSE codes) when assigning priority.
How often should What‑if reviews be repeated?
At minimum, repeat reviews when material changes occur — new tie-ins, equipment modifications, or changes to operating conditions. Many organizations also cycle through periodic reviews for critical operations or at set project phases (e.g., pre-commissioning, pre-startup). After incidents or near-misses, a focused What‑if can help test corrective actions and prevent recurrence.
Can What‑if support IEC 61511 SIL verification?
Yes. While not a quantitative method itself, What‑if reviews frequently highlight scenarios where risk reduction depends heavily on instrumented functions. Those scenarios can be routed to LOPA studies to verify that independent protection layers and target SILs per IEC 61511 are appropriate and achievable.
How does this relate to Bowtie or QRA?
What‑if is a front-end technique that surfaces scenarios and barriers. Bowtie diagrams can then visualize barrier placement and degradation factors. Where risk needs quantification, selected scenarios feed into LOPA or QRA, depending on data availability and decision needs.
Is the method recognized by UAE regulators?
Regulators do not prescribe a single technique for every situation, but scenario-based hazard identification is consistent with OSHAD-SF expectations and ADNOC HSE requirements. Demonstrating a structured process with documented outcomes, ownership, and verification is key to satisfying oversight bodies such as Dubai Municipality and Civil Defence.
Conclusion
Returning to the original question — What-if analysis provides a pragmatic, disciplined way to ask the right “what could go wrong?” questions and convert the answers into safeguards that protect people, the environment, and business continuity. It complements HAZID and HAZOP by bringing flexible, scenario-driven thinking to construction, commissioning, and day-to-day operations, and it links naturally into LOPA and Bowtie when deeper analysis is warranted. By defining scope clearly, assembling the right multi-disciplinary team, and integrating outcomes with management systems and verification, organizations can turn a simple question into a powerful driver of risk reduction and compliance — whether the facility is an offshore platform, a petrochemical unit, a power plant, or a complex construction site.
To go further on this topic, NPM’s broader What If Analysis Services UAE page covers this in more depth.
Explore NPM’s References
For decision-makers seeking assurance that methods like What‑if analysis can be applied credibly and consistently, NPM’s references offer a detailed view of outcomes across industries and project phases. Our portfolio spans work in refineries, offshore platforms, gas processing facilities, petrochemical plants, power and desalination assets, and complex construction environments, as well as logistics hubs handling hazardous materials. In these settings, structured scenario thinking has helped teams anticipate unexpected interactions — from SIMOPS in live plants to the reliability of safety instrumented functions — and has led to practical improvements in isolation, emergency response, and barrier management. Beyond the UAE, NPM’s worldwide track record illustrates how lessons learned migrate effectively between contexts: a lifting prompt that originated on a North Sea platform can illuminate risks on a high-rise construction site, just as a utilities failure scenario from a power island can inform commissioning practices at a large gas plant. The references also show how What‑if outcomes feed logically into HAZOP nodes, LOPA justifications aligned with IEC 61511, or Bowtie visualizations that operations teams use every day. If you are evaluating approaches to strengthen ISO 45001 and ISO 14001 implementation, or you simply want to see how structured “what if” prompts deliver measurable improvements in risk control, the case histories provide a grounded perspective that pairs methodology with results. They illustrate NPM’s emphasis on multi-disciplinary participation, clear action ownership, and verification — the practical ingredients that turn good analysis into safer, more reliable operations.
For more information about our references, visit Our References.
Speak With NPM
If you would like to discuss how scenario-based hazard identification applies to your facility, or you have a specific question about implementing these practices alongside your existing standards, NPM is here to help. We are happy to share perspectives, compare approaches, or clarify how this method links to HAZOP, LOPA, and Bowtie in your context.
For any further questions or to speak with our team, Contact Us.